ENMET AM-5175 Скачать руководство пользователя страница 13

AM-5175

 

 

ENMET Corporation 

11 

 

 

5.2 Calibration of the AM-5175 

Calibration is the process of setting the instrument up to read accurately when exposed to the target gas.  The Zero function sets 
the clean air reference point and the Span function sets the sensitivity of the instrument. 

Initial Calibration: 

Wait at least 3 – 4 hours after initially supplying power to the 

AM-5175

 instrument before initial 

calibration, overnight is preferred.  The 

AM-5175

 has been pre-calibrated at the factory, and initial field calibration should 

result in only fine-tuning to circuit, as well as a way to check that installation is successful.  It is not necessary to open the 
enclosure to make adjustment.  The calibration functions are operated with pushbuttons from outside the enclosure through the 

MENU

 and 

SELECT

 switches. 

Calibration Zero and Span functions are two separate procedures.  They operate independently of each other.  It is 
recommended that the Zero procedure be done prior to the Span procedure. 

ENMET

 Corporation recommends at least quarterly calibration of the 

AM-5175

 instrument

Calibration equipment is available from 

ENMET

 Corporation to calibrate the 

AM-5175

 instrument. 

  Calibration adapter, a length of tubing with a regulator for the gas cylinder on one end, and a calibration cup to connect to 

the sensor of the 

AM-5175

 on the other. 

  Gas cylinder, Zero gas 20.9% oxygen or Span gas, factory determined, varies by intent. 

Generally, a cylinder of 20.9% Oxygen is used to provide a Zero point or fresh air reference for the calibration.   

N

OTE

:

 Software revision may cause variations of display output. 

 

Menu

Select

 

 

Front View, 

Attaching Calibration Cup

 

Side View, 

Attaching Calibration Cup 

Menu

Select

 

 

Front View 

with Cal Cup attached 

 

 

Side View 

with calibration Adapter  

Figure 7: Calibration Adapter 

Sensor 

Gas Cylinder 

Regulator 

Calibration Cup 

Calibration Cup 

To Attach Calibration Cup: 

Slide Down over the 
retaining posts 

To Remove Calibration Cup: 

Slide Cup Up off the 
retaining posts 

Retaining Posts 

2 places 

Retaining Posts 

2 places 

Содержание AM-5175

Страница 1: ...ENMET Corporation PO Box 979 Ann Arbor MI 48106 0979 www enmet com Manual part number 80003 551 MCN 14 003 03 20 14 AM 5175 Ambient Air Monitor Manual...

Страница 2: ...Sensor Replacement 15 5 3 1 A Factory calibration must be performed 15 6 0 Accessory and Replacement Parts 16 7 0 Technical Data and Specifications 16 8 0 WARRANTY 17 List of Tables Table 1 Relay Fai...

Страница 3: ...tems packing material and carton As Is Within 5 days of receipt notify the carrier s local office and request immediate inspection of the carton and the contents After the inspection and after you hav...

Страница 4: ...information is displayed Audio Alarm Horn Audio alarm 105 dB at 30cm 12in The audio alarm is activated when the unit is in alarm Visual Indicators and Alarms LED indicators Power Fault Indicator LED G...

Страница 5: ...14 J15 J16 J17 This group of terminals is located on the Circuit Board For the contacts for each of three alarm relays and for the contacts of a fault relay See Section 3 3 Terminal J12 For VDC back u...

Страница 6: ...riate vertical surface leaving room for lid to be opened using the mounting holes provided Avoid areas with excessive vibration or temperature extremes The holes in the bottom of the enclosure are 0 1...

Страница 7: ...through a start up sequence unit serial number and software revision may be shown on the display The instrument may go into alarm briefly but the sensors stabilize quickly If the instrument persists i...

Страница 8: ...ly Open J14 K1 Relay 1 NC Normally Closed J14 K1 Relay 1 COM Common Alarm 2 J15 K2 Relay 2 NO Normally Open J15 K2 Relay 2 NC Normally Closed J15 K2 Relay 2 COM Common Alarm 3 J16 K3 Relay 3 NO Normal...

Страница 9: ...tatus See the Section 4 1 1 below 4 1 1 Typical Start Up When power is supplied to the AM 5175 the instrument will display the following sequence of information Typical start up sequence of informatio...

Страница 10: ...Display indicates mA Span range Full Scale Press MENU button Display returns to gas measurent Operational Display Flow Chart 4 2 1 Alarm Conditions AM 5175 There are three alarm set points available T...

Страница 11: ...AM 5175 Maintenance Menus Sequence Example of Display Function Normal Display Mode Measurement of CO Press and hold the MENU button for 2 4 seconds to enter the Maintenance Menu The Power Fault LED wi...

Страница 12: ...ess the Menu button to cycle through Maintenance Menus Select OR Zero Cal OK If the Zero signal is not within Preset Specs the AM 5175 will display Bad ZERO Menu Bad ZERO If the Zero signal is within...

Страница 13: ...is recommended that the Zero procedure be done prior to the Span procedure ENMET Corporation recommends at least quarterly calibration of the AM 5175 instrument Calibration equipment is available fro...

Страница 14: ...in 1 2 seconds display will change to Span If you wish to Span the sensor press the SELECT button you are now ready to apply gas Proceed to gas span step 2 If you wish to Exit the maintenance menu pre...

Страница 15: ...To exit cal press MENU button until Exit appears and press SELECT button If the sensor is outside of acceptable parameters Bad Span is displayed If the sensor did not respond an incompatible span gas...

Страница 16: ...intenance menu as shown in Figure 6 AM 5175 Maintenance Menu flow chart 1 Press the MENU button until to display Span is displayed 2 Press the SELECT button to initiate the mA Span menu 3 Press the ME...

Страница 17: ...is present remove the clip before plugging in the new sensor 6 Replace the Sensor PC board and 2 retaining screws 7 Reconnect the instrument to power 8 Recalibrate the instrument See Section 5 2 Step...

Страница 18: ...num Cylinders 67028 0200 Sensor H2S 67028 1100 Sensor O2 67028 1200 Sensor CO 73083 000 Carry Case 7 0 Technical Data and Specifications Electrical Power 15 Amp fused branch circuit 100 240 VAC 0 45A...

Страница 19: ...sed by the improper use of the product The purchaser indemnifies and saves harmless the company with respect to any loss or damages that may arise through the use by the purchaser or others of this eq...

Страница 20: ...processing delays ENMET charges a one hour minimum billing for all approved repairs with additional time billed to the closest tenth of an hour All instruments sent to ENMET are subject to a minimum...

Страница 21: ...nt Terms K COD Check one K VISA MasterCard______________________ ________ ________ Card number Expiration Card Code K American Express______________________ ________ ________ Card number Expiration Ca...

Отзывы: