82
Solution 2.5-ZC Fireplace Installation and Operation Manual
To complete the installation, make a hole of1/4" to 1/2" (6 mm à 13 mm) bigger than the
insulate pipe diameter in the outside wall of the house at the chosen location. From
outside, place the outside air inlet cap in the hole (open side down) and fasten the register
to the wall, with screws as shown bellow. Place the insulated pipe over the register tube
and over the fireplace outside air connector. At each end, carefully pull back the insulation
and plastic cover, exposing the flexible pipe. Attach the flexible pipe using pipe clamps.
For a better seal, you may also use aluminum tape. Wrap the tape around the joint
between the flexible pipe and the air inlets. Carefully push the insulation and plastic cover
back over the pipe. Fix the plastic in place using aluminum tape.
Содержание Solution 2.5-ZC
Страница 10: ...10 Solution 2 5 ZC Fireplace Installation and Operation Manual ...
Страница 11: ...Solution 2 5 ZC Fireplace Installation and Operation Manual 11 ...
Страница 39: ...Solution 2 5 ZC Fireplace Installation and Operation Manual 39 ...
Страница 87: ...Solution 2 5 ZC Fireplace Installation and Operation Manual 87 Appendix 7 Exploded Diagram and Parts List ...