Solution 2.5-ZC Fireplace Installation and Operation Manual
31
The gasket must be centred on the edge of the glass. To do this easily, peel back a
section of the paper covering the adhesive and place the gasket on a table with the
adhesive side up. Stick the end of the gasket to the middle of one edge, then press the
edge of the glass down onto the gasket, taking care that it is perfectly centred on the
gasket. Peel off more of the backing and rotate the glass and press the next section onto
the gasket. Do not stretch the gasket as you place it. Continue until you get to the start
and trim the gasket to length. Now pinch the gasket to the glass in a U shape, all around
the glass. Reinstall the glass, being careful to centre the glass carefully in the door. Do not
over-tighten the screws. Note that the two main causes of broken door glass are uneven
placement in the door and over-tightening of retaining screws.
Location Length Dimensions
Around each glass
51 ½" (131 cm)
“U” shaped
Do not abuse the glass door by striking or slamming shut. Do not use the fireplace if the
glass is broken. To change the glass, perform the same operation described above.
Both glasses used in the SOLUTION 2.5-ZC are 5 mm thick of dimension: 12" x 13,625"
and tested to reach temperatures up to 1400º F. If the glass breaks, it must be replaced
with one having the same specification. Contact your ENERZONE dealer to obtain a
genuine replacement part (see “replacement parts”, in appendix to get the proper part
number).
WARNING: TEMPERED GLASS OR ORDINARY GLASS WILL NOT WITHSTAND THE
HIGH TEMPERATURES OF THE SOLUTION 2.5-ZC.
5.1.7 Cleaning and Painting the Fireplace
Do not attempt to clean or paint the fireplace when the unit is hot.
Painted surfaces
can be wiped down with a damp cloth. Plated surfaces may be scratched by abrasive
cleaners. To maintain the finish at its original brilliance, use only a damp soft cloth to clean
plated surfaces.
If the paint becomes scratched or damaged, you can give your wood fireplace a brand
new look by repainting it with heat-resistant paint. Before painting, roughen the surface
Содержание Solution 2.5-ZC
Страница 10: ...10 Solution 2 5 ZC Fireplace Installation and Operation Manual ...
Страница 11: ...Solution 2 5 ZC Fireplace Installation and Operation Manual 11 ...
Страница 39: ...Solution 2 5 ZC Fireplace Installation and Operation Manual 39 ...
Страница 87: ...Solution 2 5 ZC Fireplace Installation and Operation Manual 87 Appendix 7 Exploded Diagram and Parts List ...