Solution 2.5-ZC Fireplace Installation and Operation Manual
59
Interior offset installation
Connection to a masonry chimney
1. Cut and frame the holes in the ceiling, floor and roof where the chimney will pass. Use
a plumb bob to line up the center of the holes. Make sure that the size of the floor and
ceiling holes are in accordance with the chimney manufacturer’s instructions.
2. From below, install a firestop (B) supplied by the chimney manufacturer in each
ceiling/floor separation through which the chimney will pass. At the attic level, install a
radiation shield from above (D). You must build framing to support the radiation shields
as per (C).
Содержание Solution 2.5-ZC
Страница 10: ...10 Solution 2 5 ZC Fireplace Installation and Operation Manual ...
Страница 11: ...Solution 2 5 ZC Fireplace Installation and Operation Manual 11 ...
Страница 39: ...Solution 2 5 ZC Fireplace Installation and Operation Manual 39 ...
Страница 87: ...Solution 2 5 ZC Fireplace Installation and Operation Manual 87 Appendix 7 Exploded Diagram and Parts List ...