Solution 2.5-ZC Fireplace Installation and Operation Manual
73
Central Forced Air Kit (not tested to EPA Standards) (AC01340)
The knock-outs provided on the back and on the sides of the SOLUTION 2.5-ZC allow the
connection of insulated flexible pipe which enables you to heat adjacent rooms up to 50
feet from the fireplace. This HVAC type pipe must comply with ULC S110 and/or UL 181,
Class 0 or Class 1 Standards and must withstand temperatures up to 250 °F.
For the complete installation procedure, see the installation manual provided with the kit.
You can also download this manual at
www.enerzone-intl.com
.
Содержание Solution 2.5-ZC
Страница 10: ...10 Solution 2 5 ZC Fireplace Installation and Operation Manual ...
Страница 11: ...Solution 2 5 ZC Fireplace Installation and Operation Manual 11 ...
Страница 39: ...Solution 2 5 ZC Fireplace Installation and Operation Manual 39 ...
Страница 87: ...Solution 2 5 ZC Fireplace Installation and Operation Manual 87 Appendix 7 Exploded Diagram and Parts List ...