52
Destination 1.6 Installation and Operation Manual
Appendix 2: Installing a Fresh Air Intake
This stove is may be connected to a fresh air intake, sold separately.
Parts needed to complete the connection are :
(A) - 49030, COLLAR 4 1/2" A 6 1/2". (2x)
(B) – AC02090, INSULATED FRESH AIR INTAKE PIPE (4' LENGTH / 5'' DIAMETER). (1x)
(C) – 49028, 5" WHITE INTAKE CAP. (1x)
You can purchase the above parts through your Enerzone dealer.
Содержание Destination 1.6
Страница 8: ...8 Destination 1 6 Installation and Operation Manual ...
Страница 9: ...Destination 1 6 Installation and Operation Manual 9 ...
Страница 35: ...Destination 1 6 Installation and Operation Manual 35 Clearances to combustible materials and floor protection ...
Страница 38: ...38 Destination 1 6 Installation and Operation Manual Clearances for shield construction ...
Страница 57: ...Destination 1 6 Installation and Operation Manual 57 Appendix 5 Exploded Diagram and Parts List ...