Destination 1.6 Installation and Operation Manual
31
PART B - INSTALLATION
6 Safety Information
6.1 Summary of Installation Cautions and Warnings
•
THE INFORMATION GIVEN ON THE CERTIFICATION LABEL AFFIXED TO THE
APPLIANCE ALWAYS OVERRIDES THE INFORMATION PUBLISHED, IN ANY OTHER
MEDIA (OWNER’S MANUAL, CATALOGUES, FLYERS, MAGAZINES AND/OR WEB
SITES).
•
MIXING OF APPLIANCE COMPONENTS FROM DIFFERENT SOURCES OR MODIFYING
COMPONENTS MAY RESULT IN HAZARDOUS CONDTIONS. WHERE ANY SUCH
CHANGES ARE PLANNED, STOVE BUILDER INTERNATIONAL INC. SHOULD BE
CONTACTED IN ADVANCE.
•
ANY MODIFICATION OF THE APPLIANCE THAT HAS NOT BEEN APPROVED IN
WRITING BY THE TESTING AUTHORITY VIOLATES CSA B365 (CANADA), AND ANSI
NFPA 211 (USA).
•
CONNECT THIS STOVE ONLY TO A LISTED FACTORY-BUILT CHIMNEY FOR USE WITH
SOLID FUEL OR TO A LINED MASONRY CHIMNEY CONFORMING TO NATIONAL AND
LOCAL BUILDING CODES.
•
IF REQUIRED, A SUPPLY OF COMBUSTION AIR SHALL BE PROVIDED TO THE ROOM
OR SPACE.
•
DO NOT CONNECT TO OR USE IN CONJUNCTION WITH ANY AIR DISTRIBUTION
DUCTWORK UNLESS SPECIFICALLY APPROVED FOR SUCH INSTALLATION.
•
DO NOT CONNECT THIS UNIT TO A CHIMNEY FLUE SERVING ANOTHER APPLIANCE.
•
MAY BE INSTALLED IN A MOBILE HOME.
•
THIS MOBILE HOME APPROVED STOVE REQUIRES INSTALLATION OF A FRESH AIR
KIT, SOLD SEPARATELY.
WARNING: DO NOT INSTALL IN SLEEPING ROOM.
WARNING: THE STOVE MUST BE ATTACHED TO THE STRUCTURE OF THE MOBILE HOME.
CAUTION: THE STRUCTURAL INTEGRITY OF THE MOBILE HOME FLOOR, WALL, AND
CEILING/ROOF MUST BE MAINTAINED.
Содержание Destination 1.6
Страница 8: ...8 Destination 1 6 Installation and Operation Manual ...
Страница 9: ...Destination 1 6 Installation and Operation Manual 9 ...
Страница 35: ...Destination 1 6 Installation and Operation Manual 35 Clearances to combustible materials and floor protection ...
Страница 38: ...38 Destination 1 6 Installation and Operation Manual Clearances for shield construction ...
Страница 57: ...Destination 1 6 Installation and Operation Manual 57 Appendix 5 Exploded Diagram and Parts List ...