5
Making it Run
Materials
You will need the following:
o
Properly installed SkyBox inverter
o
SkyBox BOS
o
SkyBox Overview Guide
o
SkyBox Quick Start Guide
Optional:
o
A small stylus to tap on the SkyBox touchscreen
o
SkyBox Programming Guide
Choosing the Right
AC Profile
Use the flow chart to the right to determine which grid
use profile is the most appropriate for your system.
Each profile is discussed in more detail in
The Power
Grid and You
on page 6.
Programming
To make the initial program settings, use the Setup
Wizard that appears during power-up. These settings
include the AC Profile, battery charging, screen
brightness, passwords, and so on.
To make additional settings after closing the Wizard,
see the
SkyBox Programming Guide
.
900-00272-01-001 Rev A
Figure 3
AC Profile Flowchart
Net Metering
with Backup
Net Metering
with Backup
Figure 3
AC Profiles
Содержание OutBack Power SkyBox
Страница 1: ...SkyBox True Hybrid Energy System Handbook...
Страница 27: ...900 00272 01 001 Rev A 27 NOTES...