Maple Leaf Mews
Kingston 10
JAMAICA
5.2. Water tank and vacuum tube assembly drawing
5.3. Solar water heater assembly step
5.3.1 Installation of frame:
Firstly, open the packing case to check the fittings related with the frames and
their quantity. They include front and rear legs, assistant bars, cross bars, tank
brackets, tail stock track, tail stocks, reflectors, cousins as well as screw bag.
Fig 1
Fig 2
www.energyplusja.com
Page 15 of 48