background image

 

Maple Leaf Mews

 

 

Kingston 10

 

 

JAMAICA

 

 

 

 

 

 
 

10. Special conditional operation

 

 
1.

 

If  tank  is  not  full,  you  can  add  water  anytime,  please  add  water  after  using  hot 

water.  If  tank  is  exposed  without  water  longer  than  15  minutes,  do  not  feed  water, 

please  make  sure  to  add  water  in  evening  or  next  day  morning,  so  it will  protect  the 

vacuum tubes from breaking for over large difference in temperature.  
 
2.

 

In order to avoid scalding, please turn on the cold water valve first, then turn on the 

hot  water  valve,  then  adjust  the  cold  water  valve  and  hot  water  until  the  suitable 

temperature of hot water is achieved, if the mixing valve is not available.  
 
3.

 

In areas which the water pressure is high, please turn down the filling water valve, 

so cold water can enter into the water tank slowly.  
 
4.

 

Collector  should  be  mirror-like,  or  else  it  means  tube  is  not  in  the  vacuum 

condition. If it appears misty, please change the tube.  
 
5.

 

Air vent in the tank must not be jammed, in order to avoid swelling or breaking the 

tank.  
 
6.

 

Keep the tank full while winding.  

 
7.

 

In  winter,  keep  the  pipeline  insulated  to  protect  it  from  freezing  in  cold  area  and 

start the electrical cable installed on the inlet and outlet pipe.  
 
8.

 

Fixing the frame carefully against the strong wind and prevent from accident.  

 
9.

 

Please do not change the structure of the solar water heater at random.  

 
10.

 

The water temperature can be very high in the summer months and steam can be 

observed  coming  outer of  the  vent  pipe.  If  the  solar  water  heater  is  not  in  use  in the 

summer  or  for  a  long  period  of  time,  it  is  advisable  to  cover  the  glass  tubes  with  a 

canvas clothes a mat.  

 

 

 

 

 

www.energyplusja.com

 

Page 40 of 48

 

 

Содержание ThermoPower-VTS30HP

Страница 1: ...r VTS30HP E The solar energy system described by this manual when properly installed and maintained meets the minimum standards established by the SRCC This certification does not imply endorsement or...

Страница 2: ...drawing 15 5 3 Solar water heater assembly step 15 6 Pipeline installation 24 6 1 plumbing system schematic map 24 6 2 plumbing connections 29 All the system labels will be packaged with the product w...

Страница 3: ...instructions Children should be supervised to ensure they DO NOT play with the appliance Prevent from burn injury touching the heat pipes in the glass tubes is strictly prohibited The evacuated tubes...

Страница 4: ...am covers of 7 cm each which are tightened on the storage tank with stretch film Then it is placed in a hard carton pack on which the indications of each model are displayed on the outside The frame a...

Страница 5: ...zation all year round even in cold windy climates where freezing does not occur below 2 degrees Celsius for short periods of time Can operate with incoming water pressures of 0 4 MPa no circulating pu...

Страница 6: ...ial is corrosion proof food grade stainless steel Foam insulation thickness is decided to maintain the tank water temperature self sustainable during continuous unclear days in the coldest wintertime...

Страница 7: ...ciency and reinforce the frame structure FRAMES Frame is made of rustproof material A frame may have full length rear legs suitable for flat surface installation or shortened rear legs suitable for sl...

Страница 8: ...quid medium in the heat pipe is heated by the heat energy and then turns into the gas medium The gas medium flows up to the top of the heat pipe and transfer the energy to the cold water in the tank a...

Страница 9: ...Model ThermoPower VTS30HP Number of Tubes 30 Gross area 4 45m 2 Tank Volumetric Capacity 300L Weight Empty 90Kg Fill weight 330Kg Length of Tubes 1800mm Outer tube diameter 58mm Tube thickness 1 6mm...

Страница 10: ...ause freezing in exposed parts of the system It is the owner s responsibility to protect the system in accordance with the Supplier s instructions if the air temperature is anticipated to approach the...

Страница 11: ...otected against freeze damage In case of black out or power outage occurs during the cold weather when the temperature is lower than 14 Fahrenheit or 10 Celsius a system drain out procedure must be fo...

Страница 12: ...he heat pipe is a small amount of pure water at a very low pressure The heat pipe HTF are built as one unit no refill is needed and the water inside will not be reduced No other fluid shall be used th...

Страница 13: ...9 Allocate a place is not shaded during 10 00AM to 3 00PM and keep the solar panel facing south with 45 degrees of adjustment tolerance The pitched degree of the panel should be close to the latitude...

Страница 14: ...Maple Leaf Mews Kingston 10 JAMAICA 5 Installation of solar water heater 5 1 Frame installation drawing www energyplusja com Page 14 of 48...

Страница 15: ...step 5 3 1 Installation of frame Firstly open the packing case to check the fittings related with the frames and their quantity They include front and rear legs assistant bars cross bars tank brackets...

Страница 16: ...Step 3 Find the tank brackets and Step 4 Take the rear side legs out and connect them with rear legs Attention connect them with the corresponding The installation of the three tank connecting holes...

Страница 17: ...he frames with the tank brackets The assistant bars are collected with the reflectors by the same screw Take the last rear leg out and connect it with the tank brackets Then use the assistant bars to...

Страница 18: ...led frames ventilate slowly and lightly Attention that insert the bolts of the water tank into the corresponding connecting holes of the tank brackets 5 3 3 Installation of the heat pipe and vacuum tu...

Страница 19: ...tness extent avoiding being too loose to cause water leakage Step 7 Install all the heat pipes according to this method Adjust the angle and the inappropriate places keeping them horizontally Then cha...

Страница 20: ...de If you do not have a compass or GPS wait until solar noon and the shadow of a vertical stick or surface will point due North True South is 180 from true North HINT MANY SOLAR SYSTEMS ARE PLACED AT...

Страница 21: ...hicago IL Boston MA Detroit MI 42 Denver CO Indianapolis IN Philadelphia 40 PA Kansas City MO St Louis MO 39 Washington DC Cincinnati OH Reno NV 39 5 San Francisco CA Sacramento CA 38 Nashville TN 36...

Страница 22: ...The solar water heater must be installed in locations with wind and snow load lower than 0 49kN m If the wind and snow load in the locations more than this value please strengthen the installation of...

Страница 23: ...ire with at least 16 mm grounding cables For building height installation height less than 20 meters do not need to adopt the special measures to protect lightning strikes o When penetrations are requ...

Страница 24: ...stop the operation of the solar collector always install a TP R valve to release some high temperature water out of the tank then mains water will charge the tank to keep the tank within normal condi...

Страница 25: ...tal length 1 4 inch per foot The illustration is the installation pipe line of pressurized solar water heater The directions of each valve and the corresponding positions should be correct There shoul...

Страница 26: ...is a reference plumbing connection diagram The formal plumbing architecture design and blueprint drawing shall always be done by a licensed architect and signed by licensed plumbers Acquire the proper...

Страница 27: ...use a three way valve and sensor pocket to install the temperature sensor at the inlet and outlet port of the water tank Fig1 sensor pocket Fig2 the top end of the Fig3 sensor pocket sensor pocket co...

Страница 28: ...e solar system is working observe the thermometer when the hot water is being used in the house The water returning from the collector on a sunny day should be at least 10 Fahrenheit warmer than the w...

Страница 29: ...JAMAICA 6 2 plumbing connections Components list and Valve labels ID Name Normal Model technical Photo Quantity operation specification position V0 City water ON 3 4 ball valve 1 shut off valve www en...

Страница 30: ...s V5 Solar Drain OFF 3 4 Drains hose outlet 1 valve connection with NPT threaded inlets 1 2 WATTS series 70A V6 Mixing Set temperature 1 Tempering Valve valve 48 9oC 120 F 160 F temperature range 120...

Страница 31: ...N Maximum operating 1 valve check pressure 400psi valve Connections list ID Name Material Model photo requirements Connection Fluid Cooper 3 4 Materials shall meet the 1 loop standards of the national...

Страница 32: ...l meet the 1 2 4 1 2 standards of the national Copper x male sanitation foundation Adapter ID Front label Back Label V0 City water shut off valve Shut this valve will shut the water supply for the Cit...

Страница 33: ...m could V3 result in a hazardous health condition V4 Solar drain valve is used to drain the Solar Isolation Valve solar system OPEN Normal operation position CLOSE V4 V5 Solar drain valve is used to d...

Страница 34: ...y the leakage of conceal pipe and other related reasons shall not be borne by our company If insulation is required the full length of the solar hot and solar cold pipes MUST BE insulated There are ma...

Страница 35: ...ike steam pipes where the additional heat levels can damage the foam tubing While they are an option for cold water pipes it would be better to just use them on the pipes with extremely hot temperatur...

Страница 36: ...t or metal tape is recommended Do not uses duct tape because it will quickly deteriorate when exposed to outdoor conditions The drain plugs on the bottom of the collector should also be completely sur...

Страница 37: ...V2 V4 and shut off the following valves V1 V3 and V5 Step 3 Keep the water running for 5 minutes to flash out the solder or stains after the water from V4 is observed Step 4 Shut off V4 and Open V3 a...

Страница 38: ...rmance condenser then reinsert it into the manifold d Pipe line does not seal and is no insulated very well so there is more energy loss Check and seal the pipe line and keep the pipeline insulated ve...

Страница 39: ...r performance The system will still operate normally even with a tube broken Any broken glass should be cleared away to prevent injury To replace a tube 1 Remove the tube clip slide broken tube out an...

Страница 40: ...cold water can enter into the water tank slowly 4 Collector should be mirror like or else it means tube is not in the vacuum condition If it appears misty please change the tube 5 Air vent in the tan...

Страница 41: ...solar system the dealer responsible for the sale will fill out the warranty card and the customer will complete a record of it and retain it for future servicing This limited warranty covers the glas...

Страница 42: ...leakage or malfunction of the system Costs associated with the replacement and repair of the unit including freight shipping or delivery charges removal installation or re installation charges any ma...

Страница 43: ...pipe screw 30 7 8 Tank support 4 8 9 Acclivitous support 4 9 10 Back leg 2 10 11 Inclined support 4 11 12 Horizontal support 4 12 13 Iron feet 8 13 14 Adjusted end cap 30 14 15 Front leg 4 15 16 Refle...

Страница 44: ...Maple Leaf Mews Kingston 10 JAMAICA www energyplusja com Page 44 of 48...

Страница 45: ...g 3 4 conditions 26 Pipe insulation 2 Per the actual install conditions 27 Pipe insulation 3 4 Per the actual install conditions 28 PVC pipe 4 Per the actual install conditions 29 Mixing valve 1 30 Ba...

Страница 46: ...l Freeze protection label Freeze Protection Information The freeze protection method of this system is thermal mass and manual draining Drain the system as instructed in the owner s manual when temper...

Страница 47: ...5110706 051 Electrical power of all electric components disable Manufacturing date 2011 Manufacture SunMaxx Solar tm Pressurized solar water heater with heat pipe and electrical element backup Type Th...

Отзывы: