Oil Heat – Eighteenth Edition – June 2015
7
Installations should utilize the Energy Kinetics tank stand or the standard boiler stand to provide a solid, level, and
smooth foundation for the boiler. Place the unit as near to the chimney or vent as possible
allowing clearance for front
cleaning and service as shown in Figure 1B
. If not using an Energy Kinetics supplied stand, provide a solid, level, and
smooth foundation with clearance for door opening and service.
NOTICE:
The stand must be
level
to allow for proper venting of air from the boiler. The Frontier is manufactured with the
BACK of the boiler
higher
than the front to assist in air removal.
Figure 1B - Boiler Clearance for Cleaning and Service
Burner
Dim “A”
Open Door
Leg Bottom to Floor
Clearance “B” (minimum)
W/O Air
box
With Air
box
Beckett AFG
8”
9-1/2"
9”
Carlin EZ-1
9”
9-1/2”
9”
Riello 40F5
13”
N/A
15”
COMBUSTION AIR
The System 2000 Boiler must be installed in an area where adequate fresh air is available to support combustion.
The Frontier is provided with a sealed Air Box that can be piped to air outside the building. Piping of outside air directly to
the boiler is highly recommended because it completely isolates the boiler from the home environment, as well as greatly
reducing operating noise from the boiler.
Boiler with outside air piping:
In modern houses with tight construction, the connection of the Air Box to an outside
air source to provide combustion air is highly recommended. The outside air source must be located high enough above
grade to be at least 12” above expected snow accumulation.
WARNING:
For systems with sidewall venting, combustion air piping from outside the building is
required
. The Energy
Kinetics sidewall vent kit contains specific instructions for installation that must be followed. Combustion air
may be supplied through PVC pipe. For EK1 use 2" pipe up to 20 feet in length with up to (5) 90-degree
elbows. For EK2 use 3" pipe up to 20 feet in length with up to (5) 90-degree elbows. A total equivalent
length of 45 feet is allowed. Each 90 degree elbow is the equivalent of 5 feet of straight pipe. For example,
if three 90 degree elbows are used, then the length of pipe run may increase to 35 feet. For longer runs up
to 40 feet with up to five 90 degree elbows, immediately increase pipe size by 1", to 3" for EK1 and 4" for
EK2. An unglued or Tek-screw joint allows the door to swing down when the air inlet pipe is disconnected.
WARNING:
Modern buildings of tight construction, as well as the operation of attic and exhaust fans, kitchen ventilation
systems, clothes dryers or fireplaces may create conditions of unsatisfactory combustion or venting.
Provisions must be made to use
combustion air that communicates with a well-ventilated attic or with the
outdoors
(such as using a louver or grate). The opening should have a free area of not less than one (1)
square inch per 4,000 BTU per hour of the total input rating.
Boiler without outside air piping:
WARNING:
The confined space shall be provided with two permanent openings, one near the top of the enclosure and
one near the bottom. Each opening shall have a free area of not less than one square inch per 1,000 BTU
per hour of the total input rating of all appliances in the enclosure, freely communicating with interior areas
having adequate infiltration from the outside.
T4
R
S
TE
M
P
. S
E
N
S
.
B
1 2 0
AL ARM
1 0 0
Z2
Z3
24VAC
Z4
Z1
ZHW
CIRC
B2
B1
IND
3
IN DUC ER
CHIM NEYLESS
ONL Y
4
H EA TI NG
HOT W ATER
2
1
1 4 0
1 3 0
CIRCU LATOR
P OW E R
1 7 0
1 5 0
1 6 0
1 9 0
B URNER
SYSTEM 2000
ENERGY MANAGER
ETICS
MA KI N G A N Y CO NN EC TI ONS
R E AD I N ST R UC TI ONS B EF OR E
ERGY
Lebanon, New Jersey
3
4
TH E R MOST AT
2
1
CAUTION
24 VA C C ONN EC TI ON ONLY .
KIN
EN
T3
A1
A2
THW
T1
T2
T4
R
S
TE
M
P
. S
E
N
S
.
B
1 20
26"
48"
*
56"
**
24"
9"
73"
30"
*
Height of EK1 Frontier Low Profile Base
**
Height of EK Standard Boiler Base
9"
*
17"
**
34"
30"
24"
9"
EK1: 41" / EK2: 49"
2"
"B"
EK1: 41" / EK2: 49"
"A"
A LA R M
1 00
Z2
Z3
24VAC
Z4
Z1
ZHW
CIRC
B2
B1
IND
3
IND UCER
C H I M N E Y LE S S
O N LY
4
H E AT IN G
HOT WATER
2
1
1 40
1 30
C IR CULA TO R
P OW E R
1 70
1 50
1 60
1 90
BU RNER
EK1: 21-1/2"
EK2: 29-1/2"
EK1: 8"
EK2: 9"
SYSTEM 2000
ENERGY MANAGER
ETICS
MA K IN G AN Y C ONN E CTI ON S
R E A D I N S TR U CT ION S BE FORE
ERGY
Lebanon , New Jersey
3
4
T H ER MOS TA T
2
1
C AU TION
2 4 VA C C ONN E CT I ON ONLY .
KIN
EN
T3
A1
A2
THW
T1
T2
EK1: 21-1/2"
EK2: 29-1/2"