Tankvision Gauge Link
Installation
Hauser
11
L00-FMU90xxx-17-00-00-xx-002
A
Attaching the instrument to the rail
B
Detaching the instrument from the rail
To remove the Tankvision Gauge Link from the mounting rail (fig. B above), first push the
enclosure upwards against the spring clip until the body of the enclosure is released from the
top of the rail, then turn the enclosure forwards, away from the mounting rail.
All electrical connections and controls are available on the front panel of the Tankvision
Gauge Link in the terminal compartment, accessed by opening the front cover / door. This is
hinged at the left and clicks shut. Press on the arrowed area at the right side of the door to
release and open.
GaugeLink_Open-Door
A
B
1.
2.
1.
2.
EN 60715
TH 35x7.5/15
(1.4x0.3/0.6)
mm (in)
2
.
1.
Содержание Tankvision Gauge Link NXA20
Страница 39: ...Tankvision Gauge Link Endress Hauser 39...
Страница 40: ...www addresses endress com 71260205...