Installation
Stamolys CA71CODcr
8
Hauser
3
Installation
3.1
Incoming acceptance, transport, storage
►
Make sure the packaging is undamaged!
►
Inform the supplier about any damage to the packaging.
Keep the damaged packaging until the matter has been settled.
►
Make sure the contents are undamaged!
►
Inform the supplier about damage to the contents. Keep the damaged products until the matter
has been settled.
►
Check that the order is complete and agrees with your shipping documents.
►
The packaging material used to store or to transport the product must provide shock protection
and humidity protection. The original packaging offers the best protection. Also, keep to the
approved ambient conditions (see "Technical data").
►
If you have any questions, please contact your supplier or your local sales center.
3.2
Installation conditions
3.2.1
Design, dimensions
a0001355
Fig. 2: GFR
version
NOTICE
Sufficient space and backwater in the outflow hose
►
Allow at least 400 mm (16") under the housing as space for the waste collecting tank.
►
On the left-hand side of the device, observe a lateral distance of at least 350 mm (13.8") for
mounting the collecting vessel.
►
The outflow hose should not form a siphon.
60 (2.36)
100(3.94)
140 (5.51)
160 (6.30)
250 (9.84)
125(4.92)
165
(6.50)
Ø
21(0.83)
Ø
26/1.02
Ø2
1
(0.83)
119(4.69)
78(3.07)
47(1.85)
648
(25.5)
360 (14.2)
436 (17.2)
243
(9.57)
200 (7.87)
120 (4.72)
326 (12.8)
330 (13.0)
110 (4.33)
Ø2
7
(1.06)
Ø 16 (0.63)
Ø 27 (1.06)
120(4.72)
555
(21.8)
465 (18.3)
500 (19.7)
7-11/
0.28 - 0.43
(M 6)
Ø 26(1.02)
mm (inch)
38 (1.5)