Installation
StamoLys CA 71 MN
8
Hauser
3
Installation
3.1
Incoming acceptance, transport, storage
•
Make sure the packaging is undamaged!
Inform the supplier about damage to the packaging.
Keep the damaged packaging until the matter has been settled.
•
Make sure the contents are undamaged!
Inform the supplier about damage to the delivery contents.
Keep the damaged products until the matter has been settled.
•
Check that the scope of delivery is complete and agrees with your order and the
shipping documents.
•
The packaging material used to store or to transport the product must provide shock
protection and humidity protection. The original packaging offers the best protection.
Also, keep to the approved ambient conditions (see "Technical data").
•
If you have any questions, please contact your supplier or your Hauser
sales centre responsible (see back page of these Operating Instructions).
3.2
Installation conditions
3.2.1
Design, dimensions
C07-CA71xxx-06-08-00-en-001.eps
Fig. 2:
CA 71 dimensions, stainless steel version
Содержание StamoLys CA 71 MN
Страница 2: ......
Страница 51: ...StamoLys CA 71 MN Appendix Endress Hauser 51...
Страница 52: ...Appendix StamoLys CA 71 MN 52 Endress Hauser...