![Endress+Hauser soliphant II FTM 30 DR Скачать руководство пользователя страница 27](http://html1.mh-extra.com/html/endress-hauser/soliphant-ii-ftm-30-dr/soliphant-ii-ftm-30-dr_operating-instructions-manual_2408466027.webp)
6 Commissioning
6.1 Preparations
Check wiring for correct connections
– to power supply (mains)
– to on-line devices
Switch on the power supply
– to the electronic insert of the Soliphant
– to the on-line devices
6.2 Function test
Check to ensure proper limit detection when filling and emptying the silo across the
point where the fork is mounted. This check is especially important with very light or
loose materials.
If the separate housing of the Soliphant is mounted in the explosion hazardous area
then the housing cover may not be opened during operation. Test only by checking
the response of on-line devices.
When mounted in a non-hazardous area, then the function can be controlled with the
LED on the electronic insert. See Page 19.
If the Soliphant does not switch, then refer to the section "Troubleshooting".
FTM 30 DR, FTM 31 DR, FTM 32 DR
6 Commissioning
Hauser
27