Prothermo NMT81
Installation
Hauser
33
5.12.1 Top anchor method
Insert a temperature probe or a WB probe into a fixed pipe and secure it with a top anchor.
In NMS5, NMS7, NMS8x, and NMT81, both can be installed in one fixed pipe or gauge
pole.
150 (5.91)
1
2
3
4
5
6
7
8
9
20 (0.79)
300 (11.81)
500 - 1000
(19.69 - 39.37)
a
500
(19.69)
100 - 150
(3.94 - 5.90)
b
400
(15.75)
!
18.2 (0.72)
!
42 (1.65)
!
27.2 (1.07)
A0042758
27
Top anchor method. Unit of measurement mm (in)
a
Distance between the base plate and the bottom element
b
Distance between the base plate and the WB probe
1
Converter (electrical compartment)
2
Flange
3
Top element
4
Temperature probe (without WB probe)
5
Stilling well hole
6
Temperature probe (with WB probe)
7
Base plate/datum plate
8
Tension wire
9
Top anchor
For the detailed installation procedure of top anchor, → 27
Содержание Prothermo NMT81
Страница 111: ......
Страница 112: ...www addresses endress com 71517024 71517024...