Flowmeter Proline 10 Modbus RS485
Electrical connection
Hauser
19
5.7
Post-connection check
Is the protective earthing established correctly?
Are the device and cable undamaged (visual check)?
Do the cables meet the requirements?
Is the terminal assignment correct?
Are all the cable glands installed, firmly tightened and leak-tight?
Are dummy plugs inserted in unused cable entries?
Are transportation plugs replaced by dummy plugs?
Are the housing screws and housing cover tightened?
Do the cables loop down before the cable gland ("water trap")?
A0042316
Does the supply voltage match the specifications on the transmitter nameplate?
Содержание Proline 10
Страница 33: ......
Страница 34: ......
Страница 35: ......
Страница 36: ...www addresses endress com 71510510 71510510 ...