Liquiline System CA80COD
Installation
Hauser
21
4. Apply the glue evenly (closed adhesive layer) to the adhesive surfaces (first sleeve, then
pipe).
5. Join the parts together immediately (screw them together as far as possible).
6. Remove any surplus glue.
7. Allow the glued parts to harden for at least 24 hours before exposing the system to
sample.
Securing the sample hose
8. Turn the union nut to remove it.
9. Secure the threaded joint and ferrule supplied on the hose to the analyzer.
10. Screw the hose with the ferrule and threaded joint into the threaded borehole.
11. Turn the union nut to secure it.
4
3
2
1
5
A0030604
12
Y strainer
1
Thread adapter nut
2
Hose to analyzer
3
Threaded joint
4
Ferrule
5
Threaded borehole
4.5
Post-installation check
After mounting, check all the connections to ensure they are secure.
Содержание CA80COD
Страница 47: ......
Страница 48: ...www addresses endress com 71391615 71391615 ...