Installation and commissioning
SPECORD PLUS
22
NOTICE
Only perform the basic correction after 2 hours warm-up time. During this period both
lamps must be switched on.
In the SPECORD 250 PLUS, start the grid correction first and then the basic correction.
Basic and grid correction
}
Remove samples and accessories that influence the beam path (globe photometer,
flow cell, etc.) from the beam paths in the sample chamber.
}
Only SPECORD 250 PLUS:
Select menu item Instrument | Correction | Grating correction.
The grid correction starts immediately.
}
Select menu item Instrument | Correction | Basic correction.
The basic correction starts immediately.
At the end of the correction process, the new correction data is permanently saved in
SPECORD PLUS and on the computer. The data remains in place until the correction val-
ues are next recorded and are used for the correction of all subsequent measurements.