HS 55 (Batch Mode)
Installation and commissioning
25
Figure 13Connections on the right of the device
1 Cell unit temperature sensor connection
("cell sensor")
1a Knurled screw for grounding
2 Connection for +5 V/+24 V supply from
the AAS
3 "AAS/RS 232" interface
4 Argon connection
5 "cell heating" connection
6 Power switch
7 Fuse holder
8 Power connection
9 Basic module
}
Connect the power cable to the power connection on the basic module. Use the mul-
tiple socket provided with the AAS device for the connection.
}
Connect the Argon hose to the bulkhead fitting on the rear.
"Hydride"/"Hg without enrich-
ment" mode
}
Select the drying hose: "Hy" for the hydride method or "Hg" for mercury detection.
}
Connect the cell hose to the drying hose via the female Luer coupling.
}
Connect the drying hose via the connection hose to the "to cell" gas outlet of the
batch module.
}
If not already done: attach the cell hose to the middle connection of the cell.