Installation and commissioning
HS 55 (Batch Mode)
22
Figure 9 Cell unit with quartz cell
1 Quartz cell for hydride method
2 Frame with quartz window
3 Lock
Installing the cell unit on the ZEEnit 650 P
The ZEEnit 650 P model is only equipped with a graphite tube furnace. In this model,
the graphite tube furnace can be pulled out of the sample chamber and the cell unit for
the Hg/hydride method can be installed.
}
Unscrew the attachment screw on the front under the graphite tube furnace.
}
Pull the graphite tube furnace out of the sample chamber.
}
Lock the furnace plate in the pulled-out position with the locking pin.
Figure 10Locking pin on the furnace plate
}
Insert the receptacle for the cell unit into the corresponding sockets on the floor
plate of the sample chamber.
}
Attach the cell unit to the receptacle and lock it with the attachment screw.