10  RECOMMENDATIONS OF USE OF CONCRETE VIBRATOR 

1.  Choose  the  type  of  vibrator  adequate  to  the  dimensions  of  the  structure  to  vibrate,  the  distance 
among  the  reinforcement  and  the  slump  cone.  It  is  recommendable  to  have  an  additional  concrete 
vibrator. 

2. Before starting, check that the concrete vibrator is in good condition and it works correctly. Use the 
means of safety and protection. 

3.  Pour  the  concrete  in  the  structure  avoiding  high  heights.  Try  to  pour  levelled  the  concrete.  The 
thickness of every layer should be less than 50 cm, it is recommendable between 30 and 50 cm.  

4. Introduce the vibrator vertically in the concrete mass without moving it horizontally. Do not use the 
vibrator to push the concrete horizontally. The concrete vibrator should be introduced into the mass at 
regular intervals. The interval should be from 8 to 10 times the diameter of the poker. See the concrete 
in  the  process  of  vibrating  to  determine  the  field  of  action  of  the  vibrator.  This  field  should  be 
overlapped to avoid areas without vibrating. To obtain an optimum compacting of the concrete, plunge 
it 10 cm into the precedent layer to assure a good adherence. The time in vibrating the different layers 
should not be big to avoid cold joints. Do not push or force the vibrator into the mass, it could be stuck 
in the reinforcements. 

5. The time of vibration in each point depends on the type of the concrete, the size of the vibrator and 
other factors. This time can be from 5 to  15 seconds after the immersion  in each point. The time  is 
shorter for a fluid mass, a vibration in excess can produce segregation. It is considered the concrete 
to be well vibrated when the surface around the poker is shiny and compact and there is no more air 
bubbles, as well a change in the noise of the vibrator is produced. So much defects in structures are 
produced due to perform the vibration in an immethodically way and in a hurry. 

6. Do not push or force the vibrator against the reinforcement. Keep a distance of 7 cm minimum from 
the walls.  

7. Always remove the poker vertically with movements upwards and downwards so the concrete fills 
the empty space again. Do not switch off until you stop the vibration completely. Se speed of removing 
is approximately 8 cm per second. When the vibrator is nearly out extract quickly to avoid shaking the 
surface.  

8.  In  order  to  vibrate  slabs,  the  poker  has  to  be  kept  oblique  so  that  the  contact  surface  with  the 
concrete mass is bigger and the compacting effect is better. 

9. Do not keep the concrete vibrator out  of the concrete  during  long periods. If you do not continue 
vibrating stop it. 

10. Follow the maintenance instructions. 

The concrete must be carefully prepared to get the best effects of the vibration in terms of consistency 
and resistance. 

 

 

Содержание VIB-BAR E-BATT

Страница 1: ...Manual de instrucciones Instruction manual Manuel d instructions MX 982 2003 VIB BAR E BATT ABP TBP VIB BAR E BATT TRANSMISIONES Y AGUJAS VIB BAR E BATT FLEXIBLE SHAFT AND POKERS VIB BAR E BATT TRANSM...

Страница 2: ......

Страница 3: ...AD ESPEC FICAS 7 5 PUESTA EN MARCHA Y FUNCIONAMIENTO 8 5 1 ANTES DE INICIAR EL TRABAJO 8 5 2 PUESTA EN SERVICIO 8 5 3 CONEXION DE LA TRANSMISION AL MOTOR 9 5 4 INSPECCION 9 6 MEDIDAS DE DESGASTE PARA...

Страница 4: ...mos que lea y entienda las normas de seguridad mantenimiento y utilizaci n recogidas en este manual de instrucciones Las piezas defectuosas deben ser reeemplazadas inmediatamente para evitar problemas...

Страница 5: ...UADRADO HEMBRA 7 TIPO CONEXI N A TRANSMISI N ROSCA M36x2 IZDA PESO 3 2Kg APLICACI N Transmitir el movimiento a un vibrador interno a trav s de una sirga Enganche para la correa Adhesivo de seguridad B...

Страница 6: ...uado para resistir la vibraci n Dispone de un pulsador que al presionarlo permite visualizar en el display digital la cantidad de carga y la temperatura de la bater a de forma alternativa Para extraer...

Страница 7: ...da a el interruptor y o la caja de conexiones En caso de detectar alg n da o el ctrico en la m quina p ngase en contacto con el servicio t cnico de ENARCO o con un distribuidor autorizado 4 3 SEGURIDA...

Страница 8: ...torizado CARGUE exclusivamente bater as 98202 98203 de ENARCO NO SOBRECARGUE el cargador de la bater a Una vez que el display del cargador muestre una carga del 100 desconecte el cargador de la red pa...

Страница 9: ...funcionamiento de la herramienta Si se da a REALICE un mantenimiento antes de usarla UTILICE los accesorios recomendados por el fabricante para el modelo utilizado 4 7 SERVICIO El mantenimiento de la...

Страница 10: ...motor Si la bater a est cargada al m ximo es posible que sea necesario accionar el interruptor 2 3 veces La bater a tiene un sistema de protecci n de sobrecarga que en algunas condiciones act a cuando...

Страница 11: ...tos que hagan peligrar la manipulaci n segura se debe suspender el trabajo y realizar el mantenimiento correspondiente 6 MEDIDAS DE DESGASTE PARA DI METROS Y LONGITUDES EN LAS AGUJAS VIBRANTES A Las m...

Страница 12: ...ueda penetrar en la aguja 7 Despu s de trabajos de mantenimiento se deber n montar correctamente todas las partes 8 Cada 12 meses o con m s frecuencia dependiendo de las condiciones de uso se recomien...

Страница 13: ...ZA SEG N LA LISTA DE PIEZAS Es recomendable incluir el N MERO DE FABRICACI N DE LA M QUINA 2 La placa de identificaci n con los n meros de serie y la descripci n del modelo se encuentra en la situada...

Страница 14: ...tro del hormig n este podr a quedar atrapado en el refuerzo 5 El tiempo de vibrado en cada punto depender del tipo de hormig n tama o del vibrador y otros factores Este tiempo de vibrado puede oscilar...

Страница 15: ...RVICE 7 4 8 SPECIFIC SAFETY RULES 7 5 OPERATION 8 5 1 GETTING STARTED 8 5 2 OPERATION CONDITIONS 8 5 3 CONNECTION OF THE TRANSMISSION TO THE POWER UNIT 9 5 4 INSPECTION 9 6 DIMENSIONS OF WEAR DIAMETER...

Страница 16: ...ent we recommend to read carefully the safety recommendations maintenance and usage listed in this manual Defective parts must be replaced immediately to avoid major problems The effective longevity o...

Страница 17: ...i Ion FLEXIBLE SHAFT CONNECTION FEMALE SQUARE 7 HOSE CONNECTION LEFT THREAD M36x2 WEIGHT 3 2Kg APPLICATION Transmit the movement to an internal vibrator through a flexible shaft Belt hook Safety stick...

Страница 18: ...TERY FEATURES The rechargeable Li Ion battery is mounted on a shock absorber support to resist vibration It has a button that when pressed shows the charge level and the battery temperature alternatel...

Страница 19: ...cable is damaged DO NOT OPERATE the machine if the switch or the connections box is damaged If you detect any electrical damage to the device contact the technical service of ENARCO or an authorized d...

Страница 20: ...o rain or wet conditions Keep it clean and dry CHARGE only batteries 98202 98203 from ENARCO DO NOT OVERLOAD the charger of the battery Disconnect the charger from the mains once the light of the LED...

Страница 21: ...s breakage of parts and any other condition that may affect the tools operation If damaged contact the technical service or an authorized dealer before using again USE only accessories that are recomm...

Страница 22: ...Check the battery charge status 6 Turn on the motor Sometimes if the battery is fully charged it is necessary to operate the switch 2 3 times in a row This is due to the battery has an overcharge prot...

Страница 23: ...a safe handling the work must be suspended and the corresponding maintenance carried out 6 DIMENSIONS OF WEAR FOR DIAMETERS AND LENGTHS OF THE POKERS A The minimum dimensions are bold printed B The d...

Страница 24: ...ssembled correctly 8 Every 12 months or more frequently depending on the usage conditions it is recommended to make an inspection by an authorized dealer 7 2 STORAGE 1 Always store the screed clean in...

Страница 25: ...S 9 1 INSTRUCTIONS TO ORDER SPARE PARTS 1 Every spare parts order must include PART CODE NUMBER AS STATED IN THE PARTS LIST We recommend including the MACHINE SERIAL NUMBER 2 The identification plate...

Страница 26: ...force the vibrator into the mass it could be stuck in the reinforcements 5 The time of vibration in each point depends on the type of the concrete the size of the vibrator and other factors This time...

Страница 27: ...RIT SP CIFIQUES 7 MISE EN SERVICE ET FONCTIONNEMENT 8 5 1 AVANT DE COMMENCER LE TRAVAIL 8 5 2 MISE EN MARCHE 8 5 3 CONNEXION DE LA TRANSMISSION AU MOTEUR 9 5 4 R VISION 9 MESURES D USURE POUR LES DIAM...

Страница 28: ...nous vous recommandons de lire et de comprendre les r gles de s curit d entretien et d utilisation contenues dans ce manuel d instructions Les pi ces d fectueuses doivent tre remplac es imm diatement...

Страница 29: ...E FLEXIBLE FEMELLE CARR 7 TYPE DE CONNEXION TRANSMISSION VISSER M36X2 GAUCHE POIDS 3 2Kg APPLICATION Transmet le mouvement un vibrateur interne via une corde de remorquage Accroche Bandoulliere Autoco...

Страница 30: ...un support matelass pour r sister aux vibrations Il dispose d un bouton qui lorsqu il est enfonc permet d afficher d une mani re alternative la quantit de charge et la temp rature de la batterie sur l...

Страница 31: ...onenexions Au cas ou vous constatez des dommages electriques sur la machine veuillez contactez le service technique d ENARCO ou un concessionnaire autorise 4 3 S CURIT LECTRIQUE BATTERIE UTILISEZ uniq...

Страница 32: ...re autoris CHARGEZ uniquement les batteries ENARCO 98202 ou 98203 NE PAS D PASSER le chargeur de batterie Une fois que l cran du chargeur affiche une charge de 100 d connectez le chargeur du r seau af...

Страница 33: ...tretien avant utilisation UTILISEZ les accessoires recommand s par le fabricant pour le mod le utilis 4 7 SERVICE L entretien de l outil ne DOIT TRE EFFECTU que par un personnel qualifi Lors de l exam...

Страница 34: ...charg e actionnez l interrupteur 2 3 fois La batterie dispose d un syst me de protection contre les surcharges qui fonctionne seulement lorsque la batterie est compl tement charg e 7 Effectuez le tra...

Страница 35: ...DIAM TRES ET LONGUEURS DES AIGUILLES VIBRANTES A Les mesures minimales sont imprim es en gras B Les mesures entre parenth ses sont les mesures originales C Le tube doit tre remplac d s qu il atteint l...

Страница 36: ...oivent tre correctement assembl es 7 Tous les 12 mois ou plus fr quemment selon les conditions d utilisation il est recommand de le faire r viser par un atelier agr par ENARCO 7 2 STOCKAGE 1 Stockez v...

Страница 37: ...utilisation de l quipement 2 Dans toutes les demandes de garantie LA MACHINE DOIT TRE ENVOY E ENARCO S A OU ATELIER AUTORIS en indiquant toujours l adresse et le nom complet du destinataire 3 Le S A...

Страница 38: ...Ne forcez pas et ne poussez pas le vibrateur dans le b ton il pourrait se coincer dans l armature 5 Le temps de vibration chaque point d pendra du type de b ton de la taille du vibreur et d autres fac...

Страница 39: ...WEB POUR CONSULTER TOUS LES RENSEIGNEMENTS DES PI CES DETACHEES OU LA LISTE DE NOS MACHINES VOIR NOTRE SITE www enar es FOR ANY REQUIREMENT ABOUT THE PART LIST OF OUR MACHINES CONSULT OUR WEB PAGE UM...

Страница 40: ...zczeg lniona maszyna Certifica si declara ca echipamentul mentionat mai jos ha sido fabricada de acuerdo con las siguientes normas has been manufactured according to the following standards est produi...

Отзывы: