background image

 

                 VIB-BAR E-BATT –

 

FLEXIBLE SHAFT AND POKER

 

en

 

ABP38 

TBP0.5m / VIB-BAR

 

10

 

10

 

grease penetrates into the poker, or overforces the motor. Do not clean the flexible shaft with 
solvent. Ask the manufacturer the type of grease that must be used. 

5. 

Every 300 hours of working is recommended to clean the poker.  To clean  the poker dismount 
the cap. Hold the housing on a vise and tap the cap with a hammer. This will help to break the 
seal and to loosen the threads. Clean the cap and cones with a solvent and fix again with Loctite 
243 or equivalent. If rests of grease are inside change the gaskets following point 5. 

6. 

To do maintenance follows the following steps: 

-    Flush the parts with solvent and wipe all part. It is very important to keep the cones clean. 

Examine  bearing  and  seals.  If  inspection  reveals  that  grease  of  transmission  has 

penetrated into the head, the oil seals must be replaced. When replacing the seals, mount them 
in the same direction (neoprene seal lips must face the hose side). 

-  

The purpose of the seals is to keep the flexible shaft grease out from the poker. Be careful 

not  to  damage  the  polished  surface  where  the  seals  are  assembled.  Once  the  seals  are 
dismounted it is recommended to replace them. 

Apply  sealant  before  assembling  and  fix  the  O-ring.  Tighten  and  clean  the  excess  of 

sealant. It is important that all the parts are tightened to avoid water and concrete get into the 
head. 

7. 

After maintenance works and service, all the parts must be assembled correctly.  

8. 

Every 12 months or more frequently, depending on the usage conditions, it is recommended to 
make an inspection by an authorized dealer. 

7.2 STORAGE 

1. 

Always store the screed clean, in dry and protected areas, when it is not used for a long time. 

2. 

To prevent corrosion occurs, store the batteries in a place with relative humidity less than 80%. 

3. 

Store batteries at a distance greater than 2.5m from other dangerous substances. 

4. 

Store batteries separate from metal products. 

5. 

Store the batteries at a temperature between 5 and 25ºC. 

6. 

If  the  batteries  are  stored  for  a  long  time,  they  must  be  in  a  dry  place  at  the  specified 
temperature and they must be fully charged every 3 months. 

7.3 TRANSPORTATION 

1. 

During transportation, the screed must be ensured against slipping, overturning and bumps. 

2. 

Batteries are governed by a specific standard for packaging and transport, with restrictions in 
some cases, especially in cases of air transport. Respect these rules depending on the means 
of transport used. 

3. 

To pack and transport the charger, do not fold the cables, roll them up without forcing them. 

7.4 WASTE DISPOSAL 

1. 

Disposal of the  battery must be done through your dealer, the manufacturer or at the battery 
waste  management  points  designated  for  this  purpose.  The  seller  and  the  manufacturer  are 
obliged to collect the battery and to arrange its proper recycling or disposal. 

2. 

NEVER dispose of the battery as if it were household waste, it may cause serious damage to 
the environment 

3. 

Proceed  to  recycle  the  rest  of  the  electrical  and  mechanical  components  according  to  the 
current regulations for each type of waste in your country. 

 

Содержание VIB-BAR E-BATT

Страница 1: ...Manual de instrucciones Instruction manual Manuel d instructions MX 982 2003 VIB BAR E BATT ABP TBP VIB BAR E BATT TRANSMISIONES Y AGUJAS VIB BAR E BATT FLEXIBLE SHAFT AND POKERS VIB BAR E BATT TRANSM...

Страница 2: ......

Страница 3: ...AD ESPEC FICAS 7 5 PUESTA EN MARCHA Y FUNCIONAMIENTO 8 5 1 ANTES DE INICIAR EL TRABAJO 8 5 2 PUESTA EN SERVICIO 8 5 3 CONEXION DE LA TRANSMISION AL MOTOR 9 5 4 INSPECCION 9 6 MEDIDAS DE DESGASTE PARA...

Страница 4: ...mos que lea y entienda las normas de seguridad mantenimiento y utilizaci n recogidas en este manual de instrucciones Las piezas defectuosas deben ser reeemplazadas inmediatamente para evitar problemas...

Страница 5: ...UADRADO HEMBRA 7 TIPO CONEXI N A TRANSMISI N ROSCA M36x2 IZDA PESO 3 2Kg APLICACI N Transmitir el movimiento a un vibrador interno a trav s de una sirga Enganche para la correa Adhesivo de seguridad B...

Страница 6: ...uado para resistir la vibraci n Dispone de un pulsador que al presionarlo permite visualizar en el display digital la cantidad de carga y la temperatura de la bater a de forma alternativa Para extraer...

Страница 7: ...da a el interruptor y o la caja de conexiones En caso de detectar alg n da o el ctrico en la m quina p ngase en contacto con el servicio t cnico de ENARCO o con un distribuidor autorizado 4 3 SEGURIDA...

Страница 8: ...torizado CARGUE exclusivamente bater as 98202 98203 de ENARCO NO SOBRECARGUE el cargador de la bater a Una vez que el display del cargador muestre una carga del 100 desconecte el cargador de la red pa...

Страница 9: ...funcionamiento de la herramienta Si se da a REALICE un mantenimiento antes de usarla UTILICE los accesorios recomendados por el fabricante para el modelo utilizado 4 7 SERVICIO El mantenimiento de la...

Страница 10: ...motor Si la bater a est cargada al m ximo es posible que sea necesario accionar el interruptor 2 3 veces La bater a tiene un sistema de protecci n de sobrecarga que en algunas condiciones act a cuando...

Страница 11: ...tos que hagan peligrar la manipulaci n segura se debe suspender el trabajo y realizar el mantenimiento correspondiente 6 MEDIDAS DE DESGASTE PARA DI METROS Y LONGITUDES EN LAS AGUJAS VIBRANTES A Las m...

Страница 12: ...ueda penetrar en la aguja 7 Despu s de trabajos de mantenimiento se deber n montar correctamente todas las partes 8 Cada 12 meses o con m s frecuencia dependiendo de las condiciones de uso se recomien...

Страница 13: ...ZA SEG N LA LISTA DE PIEZAS Es recomendable incluir el N MERO DE FABRICACI N DE LA M QUINA 2 La placa de identificaci n con los n meros de serie y la descripci n del modelo se encuentra en la situada...

Страница 14: ...tro del hormig n este podr a quedar atrapado en el refuerzo 5 El tiempo de vibrado en cada punto depender del tipo de hormig n tama o del vibrador y otros factores Este tiempo de vibrado puede oscilar...

Страница 15: ...RVICE 7 4 8 SPECIFIC SAFETY RULES 7 5 OPERATION 8 5 1 GETTING STARTED 8 5 2 OPERATION CONDITIONS 8 5 3 CONNECTION OF THE TRANSMISSION TO THE POWER UNIT 9 5 4 INSPECTION 9 6 DIMENSIONS OF WEAR DIAMETER...

Страница 16: ...ent we recommend to read carefully the safety recommendations maintenance and usage listed in this manual Defective parts must be replaced immediately to avoid major problems The effective longevity o...

Страница 17: ...i Ion FLEXIBLE SHAFT CONNECTION FEMALE SQUARE 7 HOSE CONNECTION LEFT THREAD M36x2 WEIGHT 3 2Kg APPLICATION Transmit the movement to an internal vibrator through a flexible shaft Belt hook Safety stick...

Страница 18: ...TERY FEATURES The rechargeable Li Ion battery is mounted on a shock absorber support to resist vibration It has a button that when pressed shows the charge level and the battery temperature alternatel...

Страница 19: ...cable is damaged DO NOT OPERATE the machine if the switch or the connections box is damaged If you detect any electrical damage to the device contact the technical service of ENARCO or an authorized d...

Страница 20: ...o rain or wet conditions Keep it clean and dry CHARGE only batteries 98202 98203 from ENARCO DO NOT OVERLOAD the charger of the battery Disconnect the charger from the mains once the light of the LED...

Страница 21: ...s breakage of parts and any other condition that may affect the tools operation If damaged contact the technical service or an authorized dealer before using again USE only accessories that are recomm...

Страница 22: ...Check the battery charge status 6 Turn on the motor Sometimes if the battery is fully charged it is necessary to operate the switch 2 3 times in a row This is due to the battery has an overcharge prot...

Страница 23: ...a safe handling the work must be suspended and the corresponding maintenance carried out 6 DIMENSIONS OF WEAR FOR DIAMETERS AND LENGTHS OF THE POKERS A The minimum dimensions are bold printed B The d...

Страница 24: ...ssembled correctly 8 Every 12 months or more frequently depending on the usage conditions it is recommended to make an inspection by an authorized dealer 7 2 STORAGE 1 Always store the screed clean in...

Страница 25: ...S 9 1 INSTRUCTIONS TO ORDER SPARE PARTS 1 Every spare parts order must include PART CODE NUMBER AS STATED IN THE PARTS LIST We recommend including the MACHINE SERIAL NUMBER 2 The identification plate...

Страница 26: ...force the vibrator into the mass it could be stuck in the reinforcements 5 The time of vibration in each point depends on the type of the concrete the size of the vibrator and other factors This time...

Страница 27: ...RIT SP CIFIQUES 7 MISE EN SERVICE ET FONCTIONNEMENT 8 5 1 AVANT DE COMMENCER LE TRAVAIL 8 5 2 MISE EN MARCHE 8 5 3 CONNEXION DE LA TRANSMISSION AU MOTEUR 9 5 4 R VISION 9 MESURES D USURE POUR LES DIAM...

Страница 28: ...nous vous recommandons de lire et de comprendre les r gles de s curit d entretien et d utilisation contenues dans ce manuel d instructions Les pi ces d fectueuses doivent tre remplac es imm diatement...

Страница 29: ...E FLEXIBLE FEMELLE CARR 7 TYPE DE CONNEXION TRANSMISSION VISSER M36X2 GAUCHE POIDS 3 2Kg APPLICATION Transmet le mouvement un vibrateur interne via une corde de remorquage Accroche Bandoulliere Autoco...

Страница 30: ...un support matelass pour r sister aux vibrations Il dispose d un bouton qui lorsqu il est enfonc permet d afficher d une mani re alternative la quantit de charge et la temp rature de la batterie sur l...

Страница 31: ...onenexions Au cas ou vous constatez des dommages electriques sur la machine veuillez contactez le service technique d ENARCO ou un concessionnaire autorise 4 3 S CURIT LECTRIQUE BATTERIE UTILISEZ uniq...

Страница 32: ...re autoris CHARGEZ uniquement les batteries ENARCO 98202 ou 98203 NE PAS D PASSER le chargeur de batterie Une fois que l cran du chargeur affiche une charge de 100 d connectez le chargeur du r seau af...

Страница 33: ...tretien avant utilisation UTILISEZ les accessoires recommand s par le fabricant pour le mod le utilis 4 7 SERVICE L entretien de l outil ne DOIT TRE EFFECTU que par un personnel qualifi Lors de l exam...

Страница 34: ...charg e actionnez l interrupteur 2 3 fois La batterie dispose d un syst me de protection contre les surcharges qui fonctionne seulement lorsque la batterie est compl tement charg e 7 Effectuez le tra...

Страница 35: ...DIAM TRES ET LONGUEURS DES AIGUILLES VIBRANTES A Les mesures minimales sont imprim es en gras B Les mesures entre parenth ses sont les mesures originales C Le tube doit tre remplac d s qu il atteint l...

Страница 36: ...oivent tre correctement assembl es 7 Tous les 12 mois ou plus fr quemment selon les conditions d utilisation il est recommand de le faire r viser par un atelier agr par ENARCO 7 2 STOCKAGE 1 Stockez v...

Страница 37: ...utilisation de l quipement 2 Dans toutes les demandes de garantie LA MACHINE DOIT TRE ENVOY E ENARCO S A OU ATELIER AUTORIS en indiquant toujours l adresse et le nom complet du destinataire 3 Le S A...

Страница 38: ...Ne forcez pas et ne poussez pas le vibrateur dans le b ton il pourrait se coincer dans l armature 5 Le temps de vibration chaque point d pendra du type de b ton de la taille du vibreur et d autres fac...

Страница 39: ...WEB POUR CONSULTER TOUS LES RENSEIGNEMENTS DES PI CES DETACHEES OU LA LISTE DE NOS MACHINES VOIR NOTRE SITE www enar es FOR ANY REQUIREMENT ABOUT THE PART LIST OF OUR MACHINES CONSULT OUR WEB PAGE UM...

Страница 40: ...zczeg lniona maszyna Certifica si declara ca echipamentul mentionat mai jos ha sido fabricada de acuerdo con las siguientes normas has been manufactured according to the following standards est produi...

Отзывы: