background image

37408-0-0616

Page 5

requireMents For MassacHusetts

For all side wall horizontally vented gas fueled equipment installed 

in every dwelling, building or structure used in whole or in part for 

residential  purposes,  including  those  owned  or  operated  by  the 

Commonwealth and where the side wall exhaust vent termination 

is less than seven (7) feet above finished grade in the area of the 

venting, including but not limited to decks and porches, the following 

requirements shall be satisfied:

1.  INSTALLATION OF CARBON MONOXIDE DETECTORS. 

At the time of installation of the side wall horizontal vented 

gas fueled equipment, the installing plumber or gasfitter shall 

observe that a hard wired carbon monoxide detector with an 

alarm and battery back-up is installed on the floor level where 

the gas equipment is to be installed. In addition, the installing 

plumber or gasfitter shall observe that a battery operated or 

hard wired carbon monoxide detector with an alarm is installed 

on each additional level of the dwelling, building or structure 

served by the side wall horizontal vented gas fueled equipment. 

It shall be the responsibility of the property owner to secure the 

services of qualified licensed professionals for the installation 

of hard wired carbon monoxide detectors

 

a.  In the event that the side wall horizontally vented gas fu

-

eled equipment is installed in a crawl space or an attic, 

the hard wired carbon monoxide detector with alarm and 

battery back-up may be installed on the next adjacent floor 

level.

 

b.  In the event that the requirements of this subdivision can not 

be met at the time of completion of installation, the owner 

shall have a period of thirty (30) days to comply with the 

above requirements; provided, however, that during said 

thirty (30) day period, a battery operated carbon monoxide 

detector with an alarm shall be installed.

2.  APPROVED CARBON MONOXIDE DETECTORS. Each carbon 

monoxide detector as required in accordance with the above 

provisions shall comply with NFPA 720 and be ANSI/UL 2034 

listed and IAS certified. 

3.  SIGNAGE. A metal or plastic identification plate shall be per

-

manently mounted to the exterior of the building at a minimum 

height  of eight  (8)  feet above  grade  directly  in  line  with  the 

exhaust vent terminal for the horizontally vented gas fueled 

heating appliance or equipment. The sign shall read, in print size 

no less than one-half (1/2) inch in size,

 “Gas Vent DirectlY 

BELoW. KEEP CLEAR oF ALL oBStRUCtIonS”.

4.  INSPECTION. The state or local gas inspector of the side wall 

horizontally  vented  gas  fueled  equipment  shall  not  approve 

the installation unless, upon inspection, the inspector observes 

carbon monoxide detectors and signage installed in accordance 

with the provisions of 248 CMR 5.08(2)(a) 1 through 4.

 

(b)  EXEMPTIONS: The following equipment is exempt from 

248 CMR 5.08(2)(a)1 through 4: 

 

 

1.  The equipment listed in Chapter 10 entitled “Equip-

ment Not Required To Be Vented” in the most current 

edition of NFPA 54 as adopted by the Board; and 

 

 

2.  Product Approved side wall horizontally vented gas 

fueled equipment installed in a room or structure 

separate from the dwelling, building or structure used 

in whole or in part for residential purposes. 

 

(c)  MANUFACTURER REQUIREMENTS - GAS EQUIPMENT 

VENTING SYSTEM PROVIDED. When the manufacturer of 

Product Approved side wall horizontally vented gas equip

-

ment provides a venting system design or venting system 

components with the equipment, the instructions provided 

by the manufacturer for installation of the equipment and 

the venting system shall include:

 

 

1.  Detailed instructions for the installation of the venting 

system design or the venting system components; and

 

 

2.  A complete parts list for the venting system design or 

venting system. 

 

(e)  A copy of all installation instructions for all Product Approved 

side  wall  horizontally  vented  gas  fueled  equipment,  all 

venting instructions, all parts lists for venting instructions, 

and/or all venting design instructions shall remain with the 

appliance or equipment at the completion of the installation. 

Содержание DV-25-5SG

Страница 1: ...er gases unless a certified kit is used Installer Leave this manual with the appliance Consumer Retain this manual for future reference WARNING If the information in these instructions are not followe...

Страница 2: ...s Supply 7 Clearances 8 Installation Instructions 8 10 Optional Thermostat Location 11 Lighting Instructions 12 Pilot Flame Characteristics 13 Main Burner Flame Characteristics 13 Maintenance 14 Troub...

Страница 3: ...service person More frequent cleaning may be required due to excessive lint from carpet ing bedding materials etc It is imperative that control compartments burners and circulating air passageways of...

Страница 4: ...gas can adsorb or absorb onto or into walls masonry and other materials and fabrics in a room That will take some of the odorant out of the gas reducing its odor intensity LP Gas may stratify in a clo...

Страница 5: ...detector as required in accordance with the above provisions shall comply with NFPA 720 and be ANSI UL 2034 listed and IAS certified 3 SIGNAGE A metal or plastic identification plate shall be per man...

Страница 6: ...protected so it is not subject to physical damage by a moving vehicle Qualified Installing Agency Installation and replacement ofgas piping gas utilization equipment or accessories and repair and serv...

Страница 7: ...bbles on all exposed connections and if unexposed a pressure test should be made Never use an exposed flame to check for leaks Appliance must be disconnected from piping at inlet of control valve and...

Страница 8: ...all studs The wall studs can be used for attachment of wall mounting bracket The wall opening required as shown in Figure 3 is a diameter of 7 1 2 inches 191mm A template is provided in furnace carton...

Страница 9: ...e edge of the outside mounting plate Use additional caulking to correct uneven wall surface such as clapboard 2 Attach 6 152mm diameter air inlet tube onto the collar of air drop assembly Attach caulk...

Страница 10: ...e of the projection 2 x 4 51mm x 102mm framing whose outside dimensions match the overall dimensions of the mounting plate is recommended The 2 x 4 51mm x 102mm framing protects siding from possible w...

Страница 11: ...INST THE WALL PARTIAL VIEW OF LEFT REAR CORNER Figure 7 Wire Gauges It is important to use wire of a gauge proper for the length of the wire RECOMMENDED WIRE GAUGES Maximum Length Wire Gauge 1 to 10 1...

Страница 12: ...o OFF Do not force 5 Replace casing front assembly 1 Stop Read the safety information above 2 Set the thermostat to lowest setting if applicable 3 Turn off all electric power to the appliance if appli...

Страница 13: ...ular opening on the inner casing bottom On Propane gas if a whistling noise resonation occurs screw air adjustment bolt into the chamber support in order to reduce the amount of primary air If the whi...

Страница 14: ...urs a See Page 13 Primary Air Adjustment b Reduce manifold pressure c Sizemainburnerorificewithadrillbit ForDV 25use1 45mm drill bit For DV 35 use 50 drill bit Removing Main Burner 1 Disconnectthether...

Страница 15: ...ranty parts All parts listed in the Parts List have a Part Number When ordering parts first obtain the Model Number and Serial Number from the name plate on your equipment Then determine the Part Numb...

Страница 16: ...bly with Clear Mica 17 DV064 Cover Plate 18 DV988 Burner DV25 18 DV990 Burner DV35 19 R942 Thermopile 20 DV1004 Pilot Tubing w Ferrells 21 RH238 Burner Door 22 DV778 Gasket Burner Door 23 M151 Gasket...

Страница 17: ...37408 0 0616 Page 17 PARTS VIEW...

Страница 18: ...round wire beneath one of the 10 x 1 2 13mm screws on the blower housing Fan Control The automatic fan control is located in the switch box The switch box is attached to the front of the blower assemb...

Страница 19: ...er flowing water is recommended 1 2 3 4 5 6 7 8 9 10 11 12 PARTS LIST Index No Part No Description 1 R 2090 Motor 2 632016 Motor Cushion 3 RH 036 Motor Support 4 642030 Blower Wheel 5 RH 710 Blower Ho...

Страница 20: ...appliance for service What Is Not Covered Damages that might result from the use misuse or improper installation of this appliance Travel diagnostic costs and freight charges on warranted parts to an...

Страница 21: ...allateur Laissez cette notice avec l appareil Consommateur Conservez cette notice pour consultation ult riure Ne pas entreposer ni utiliser d essence ni d autres va peurs ou liquides inflammables dans...

Страница 22: ...ment du Thermostat 9 Instructions d Allumage 10 Aspect Convenable de la Flamme de la Veilleuse 11 Aspect Convenable de la Flamme du Br leur Principal 11 Maintenance 11 D tection des D fectuosit s 12 F...

Страница 23: ...nant du tapis de la litterie etc de fr quents nettoyages seront requis Il est imp ratif que les compartiments de commandes les br leurs et les passages de circulation d air de l appareil soient gard s...

Страница 24: ...ndroits avant d y aller Utiliser le t l phone de votre voisin et appeler les pompiers et une personne entra n e avec le propane Ne pas ouvrir les soupapes d approvisionnement de gaz m me si vous ne le...

Страница 25: ...loyant du gaz doivent tre install s de fa on ce que les br leurs et les appareils pour allumer les br leurs doivent tre situ s au moins 18 457mm au des sus du plancher Tous ces quipements doivent tre...

Страница 26: ...izontal doivent tre install s sur la ligne de gaz en amont du contr le de gaz Le National FuelGasCodeexigequ uneligned gouttagesoitinstall epr sdel entr e de gaz Ceci doit consister en une longueur de...

Страница 27: ...ure de l vent n est pas dans le centre du radiateur Figure 3 espaces libres 1 En choisissant un emplacement il est n cessaire de fournir l espace libre ad quat pour l acc s l installation et l entreti...

Страница 28: ...t de 4 102mm de diam tre Attacher le capuchon de l vent la plaque ext rieure de montage avec 3 vis 10 x 1 2 13mm Les vis sont fournies 4 L installation est compl t e Remontageet tanchementduSyst med v...

Страница 29: ...pend d une bonne flamme de la veilleuse La flamme doit recouvrir le haut de la thermopile Le nettoyage de l ouverture de la veilleuse et du br leur doit tre fait cause des araign es V rification du S...

Страница 30: ...si applicable 15 Mettre le thermostat au r glage d sir 16 AVERTISSEMENT Le couvercle d acc s la veilleuse doit tre gard bien ferm durant le fonctionnement VEILLEUSE THERMOCOUPLE BOUTON DE CONTR LE DU...

Страница 31: ...r et le plancher permet l acc s la goupille d ajustement d air La goupille d ajustement d air est au dessus de l ouverture rectangulaire sur le bas de la paroi int rieure Pour le Gaz Propane si un bru...

Страница 32: ...s obtenez la grandeur convenable pour la flamme de la veilleuse c V rifier la thermopile Celle ci peut tre d fectueuse ou faible d V rifier l entr e r duire au besoin e Le couvercle sur l ouverture de...

Страница 33: ...63 Descente d air exige 2 de chaque 9 DV 951 Paroi du dessus 10 DV 901 cran de chaleur 11 DV 902 Paroi int rieure US 11 15665 Paroi int rieure Canada 12 RH 705 Paroi des c t s exige 2 13 712036 Joint...

Страница 34: ...37408 0 0616 Page 14 VUE DES PI CES isolation isolati on...

Страница 35: ...teurs est attach e au devant de l assemblage de la soufflerie La bo te d interrupteurs est adjacente la chambre de com bustion Le contr le du ventilateur est un genre automatique qui ne peut pas tre a...

Страница 36: ...eur du contr le du ventilateur 7 872087 Manchon Heyco 8 DV 806 Bo te d interrupteur 9 DV 807 Couvercle de la bo te d interrupteur 10 R 2091 Assemblage des fils 19 483mm 11 8720161 Manchon Heyco 12 R 2...

Страница 37: ...37408 0 0616 Page 17 NOTES DE SERVICE...

Страница 38: ...37408 0 0616 Page 18 NOTES DE SERVICE...

Страница 39: ...37408 0 0616 Page 19 NOTES DE SERVICE...

Страница 40: ...t pas couvert Dommages pouvant r sulter de l emploi de l emploi abusif ou d une installation incorrecte de cet appareil Frais de d placement de diagnostic et de transport des pi ces sous garantie vers...

Страница 41: ...icado se use No almacene ni utilice gasolina o cualquier otro l quido o combustible en la proximidad de este o cu alquier otro aparato QU HACER SI HUELE A GAS No encienda ning n aparato No encienda ni...

Страница 42: ...s 7 Espacios Libres 8 Instrucciones de Instalaci n 8 10 Ubicaci n del Termostato 10 Instrucciones de Encendido 11 Flama Correcta del Piloto 12 Flama Correcta del Quemador Principal 12 Mantenimiento de...

Страница 43: ...ervicio profesional Una limpieza m s frecuente puede requerirse debido a hilachas de alfombra materiales de cama etc Es imperativo que compartimientos de control quemadores y pasadizos de aire del apa...

Страница 44: ...ar el aroma del gas lo que reducir a la intensidad del olor El gas LPpuede estratificarse conservarse en una rea cerrada y la intensidad de su aroma puede variar a diferentes niveles Como es m s pesad...

Страница 45: ...NO APROBADOS Cada detector de mon xido de carbono como requisito y de acuerdo a las cl usulas anteriores deber cumplir con las normas NFPA 720 y ANSI UL 2034 listada y certificada por el IAS 3 SE ALIZ...

Страница 46: ...mm 28 711mm Ancho 37 940mm 37 940mm Profundidad 11 1 2 292mm 11 1 2 292mm Entrada de Gas 1 2 13mm 1 2 13mm Accessories Ventilador DRB 1 DRB 1 Conjunto Ventilaci n para Forro de Vinilo DV 822 DV 822 Cu...

Страница 47: ...tada a la l nea de gas que se selle en el fondo en donde pueda acumularse condensaci n o part culas for neas TUYAU DALIMENTATION EN GAZ BONDE NPT DE 1 8 POUR V RIFIER LE JAUGEAGE DES CONNEXIONS SOUPAP...

Страница 48: ...orte La abertura en la pared que se requiere que se muestra en la Figura 3 es de un di metro de 7 1 2 pulgadas 191mm Una plantilla viene en la caja del aparato para ubicarlo en la pared A la mismo vez...

Страница 49: ...e la orilla del soporte exte rior Aplique recalcadura nueva debajo de esta orilla Use recalcadura adicional para corregir una superficie de pared irregular tal como tablilla intercalada instrucciones...

Страница 50: ...las terminales de la termocupla 150 250 cuando el termostato est en ON a trav s de las terminales de la termocupla Menos de 30 estando el termostato en ON en las terminales del ter mostato a la altur...

Страница 51: ...15 Ajuste el termostato a la temperatura deseada 16 PRECAUCION La cubierta del piloto debe de mantenerse cerrada firmemente durante la operaci n PERILLA DE CONTROL DE GAS SE MUESTRA EN POSICION OFF QU...

Страница 52: ...ario Figura 9 Un tornillo de ajuste de aire primario est localizado en el soporte de la c mara de combusti n El espacio libre de cuatro pulgadas 102mm entre el aparato y el piso permite acceso al torn...

Страница 53: ...r del piloto 4 El piloto y el quemador principal se apagan durante operaci n normal a Verifique las lecturas de milivoltios b Inspeccione el tama o apropiado de la llama del piloto c Inspeccioneelfunc...

Страница 54: ...Quemador DV 35 LP 29 P 190 Tub ria 30 R 191 Uni n Tuber a 31 R 5600 V lvula Gas Completa 7000 MVRLC NAT 31 R 5601 V lvula Gas Completa 7000 MVRLC LPG 32 DV 1003 Soporte V lvula 33 DV 764 Empaque Supo...

Страница 55: ...37408 0 0616 Page 15 Aislante Aislante Vista de partes...

Страница 56: ...roldelventilador al 1 terminal del socket desde el alambre negro vivo en el motor 4 Conecte el alambre verde de tierra debajo de uno de los tornillos 10 x 1 2 13mm en envoltura del ventilador Control...

Страница 57: ...ES TUBIER N QUE REEMPLAZARSE DEBE HACERSE CON CABLES DE 4 64 8mm 105 C DE TERMOPL STICO O SU EQUIVALENTE o NEUTRAL NEGRO ALCANALADO BLANCO MOTOR NEGRO NEGRO NEGRO INTERRUPTOR VENTILADOR NEGRO LISO VIV...

Страница 58: ...37408 0 0616 Page 18 NOTAS DE SERVCIO T CNICO...

Страница 59: ...37408 0 0616 Page 19 NOTAS DE SERVCIO T CNICO...

Страница 60: ...no cubre la garant a Da os que pudieran ocurrir por el uso uso indebido o instalaci n inadecuada de este artefacto Los costos de traslado y de diagn stico y los cargos por flete de las piezas en gara...

Отзывы: