background image

 

 

8

 

 

 

 

 

 

Whirlpool Control 

 

Type 230 8014B-S03 

 

 

 

 

 

Rudolf Koller GmbH   

 

 

 

 

 

Type 230 8014B-S03 

Rudolf-Koller-Stra

ße 1 

 

 

 

 

 

 

      112 Rev.2

 

A-3902 Vitis   

 

 

 

 

 

 

             Ing. Aigner A

 

Tel. +43/2841/8207

 

Fax. +43/2841/8221

 

Email: [email protected]

 

 

 

 

 

 

 

 

 

Technical changes and printing errors reserved! 

Содержание Optimus 170 Premium left

Страница 1: ...1 Optimus 170 Premium left Operating and installation instructions Is there a problem with your product or do you have any questions Please feel free to contact our hotline 020 8528 1729...

Страница 2: ...Part names 5 Operating the touch displays 6 Whirlpool control 7 10 Dry running protection and settings 10 11 Heating and secondary drying 11 12 Electrical connection and installation mounting 12 15 C...

Страница 3: ...s please take some time to read this manual before installing and starting up carefully Please open the packaging with suitable tools Accessories and sketch 1 x waterfall faucet and gasket 1 x hand sh...

Страница 4: ...4...

Страница 5: ...ts or heat it in order to avoid damage to the product Clean the spa with a soft cloth and neutral detergent 5 Do not use acidic or alkaline cleaners 6 When entering and exiting the hot tub be careful...

Страница 6: ...es 1 Overflow 2 Outflow 3 Side jets 4 Touch display 5 Air injection vent 6 Suction 7 Ground air nozzles 8 Back jets 9 Headrest 10 Waterfall faucet 11 Hot water 12 Changeover switch 13 Cold water 14 Ha...

Страница 7: ...7 Using the touch screen 1 Air nozzles 2 Water jets large jet 3 LED Light Therapy...

Страница 8: ...230 8014B S03 Rudolf Koller GmbH Type 230 8014B S03 Rudolf Koller Stra e 1 112 Rev 2 A 3902 Vitis Ing Aigner A Tel 43 2841 8207 Fax 43 2841 8221 Email office vitis at rkoller com Technical changes and...

Страница 9: ...9...

Страница 10: ...10...

Страница 11: ...nterval on off 2 Description of the status indicator LED at the switch If the controller is connected to the power grid the status indicator LED light emitting diode of the pump or fan symbol every 8...

Страница 12: ...on again immediately after stopping automatically With the first activation of the switch the the run time limits is started anew Automatic functions such as drying and disinfection according to spec...

Страница 13: ...ctivation unit ON unit on second switch activation unit interval unit off third switch activation unit OFF see first activation fourth switch activation see first activation 7 Description of the heate...

Страница 14: ...ction the switch is to be operated once The function can only be cancelled when the tub is empty 8 1 Drying When the function is activated the fan is switched on for 3 minutes 20 minutes after the dry...

Страница 15: ...t the requirements of the protective measure IP55 The outer covers of the conductors cladding must be inserted completely into the cable gland The cap nuts of the cable glands must be tightened in the...

Страница 16: ...be carried out by an electrician Furthermore the effectiveness of the implemented safety measures earth and protective conductor connections potential equaliser isolation status etc of the newly erec...

Страница 17: ...pleted successfully the final assembly can take place Final assembly 1 Put your hot tub in the intended place of use 2 Now adjust the feet of the hot tub and pay attention to the horizontal alignment...

Страница 18: ...cteria 2 Calcium deposits on the surface can be removed with cleaners please also refer to page 4 item 5 for more information 3 For the removal of superficial scratches we recommend the use of 2000s s...

Отзывы: