background image

2200

720

100

80

1000

850

650

1010

820

380

810

2200

380

720

100

820

80

650

1010

1000

810

850

1800

1800

C

- Hot water connection for 

1

/

2"

tap fittings 

F

- Cold water connection for tap fittings 

1

/

2"

O

- Connection for drainage pipe recessed in floor 

1

1

/

2"

CA - Electrical connection for sauna IPX4

(box with cable press PG 13.5)

N.B. Installation must take place once floors and
walls are completed.
The room in which the sauna is to be installed
should be at least 230 cm for the model that can be
inspected at this height)

.

O

Siphon

Net 

Weight

Kg.

123

155

2,24

6

0.5 

÷

5

bar

1/2"

Delivery

Weight 

Kg.

Delivery

Volume

m

3

ART. 122W - 122R

Vertical

Jets

3

Back 

jets

2

Foot 

jets

÷

16

Capacity

l/

min

÷

5

bar

Pressure

Min. Max

Pressure

Min. Max

Supply

1

1/2"

Drain

Conn.

HYDRAULIC CHARACTERISTICS

ELECTRICAL

CHARACTERISTICS

(1)

Multifunctions

Sauna

18

(1)  -  Before connecting the appliance, make sure that the voltage indicated on the rating plate is the same as that of the electric mains.
The information and characteristics shown do not bind Teuco Guzzini Spa who reserves the right to make any modifications it retains necessary without any prior warning or notice of replacement.

Measurements in mm.

The electrical installation must comply with the safety regulations for bathroom installation, as
described in the enclosed user’s manual.

Left-side Model

Right-side Model

Central

Showerh.

1

2MEX18

2NEX18

Art.

1,9 ÷ 2,3

Kw

Min. Max

Sauna and Multifunctions 

PRE-INSTALLATION CARD ART. 122W - 122R 

(mm 1010 x 810)

GB

Содержание 122R

Страница 1: ...jets 2 Foot jets 9 16 Capacity l min 2 5 bar Pressure Min Max Pressure Min Max Supply 1 1 2 Drain Conn HYDRAULIC CHARACTERISTICS ELECTRICAL CHARACTERISTICS 1 Multifunctions Sauna 18 1 Before connecti...

Страница 2: ...ON THE LEFT 1 2 POSITIONING THE SHOWER BASE Place the bathtub in the corner of the bathroom and make sure it is on a level by using the appropriate adjustable feet Prepare the drain connection using t...

Страница 3: ...back shower panel and into the shower base without tightening them 3 3a ASSEMBLING THE BACK PANELS Place drain cover on the drain in the shower base Move the shower base away from the corner in order...

Страница 4: ...1 so that they match up with the holes on the back panel B if necessary use a 2 5 Allen wrench Check that the seal fits properly along the entire length of the side panel B1 support Fasten the side pa...

Страница 5: ...between the back panel and the bathtub 5 6 INSTALLING THE TOP TRACK Remove the screws from the ends of the top track Insert the track onto the ends of the supports and fasten it to the back panels usi...

Страница 6: ...he lower track Lift the door up so that the top wheels N slide into the track MOUNTING THE TWO CLIMATE SAUNA DOME UNTO THE SHOWER CABIN Place the adhesive steam seal onto the top edge of the back pane...

Страница 7: ...with 2 Climates Steam Sauna Once the plugs D have been removed they should not be used again C Hot water connection Use a 90 cm flexible stainless steel hose F Cold water connection Use a 90 cm flexi...

Страница 8: ...H SEAT 3 4 2 1 7 8 6 5 4 2 3 10 EQUIPOTENTIAL EARTHING CONNECTION Connect the metal parts of the ca bin with the yellow wire as indica ted in the diagram There is a terminal at point 7 for the equipot...

Страница 9: ...2 USING THE SHOWER FOR THE FIRST TIME Once all of the connections are made and before fastening the ca bin to the wall remove all of the adhesive tags Run the regeneration and a sauna cycle following...

Страница 10: ...the frame drill a hole in the wall insert the screw with the fischer and fasten the bracket T1 to the frame tightening the screw with the washer C1 Remove the spacer and center the dome on the shower...

Отзывы: