background image

22

ASSEMBLING THE CABIN

GB

C

B1

4,2x60
Ø5

C

4,2x60
Ø5

C

APPLYING SILICONE

Apply a NEUTRAL (NON ACETIC)
silicone so as to prevent water from
leaking between the back panel
and the bathtub.

5

6

I N S TA L L I N G   T H E   T O P
TRACK

Remove the screws from the ends
of the top track.

Insert the track onto the ends of
the supports and fasten it to the
back panels using the screws and
washers (C) that were removed ear-
lier.

Tighten the screws on the ends of
the side panel support (B1), as in-
dicated in the diagram.

Содержание 122R

Страница 1: ...jets 2 Foot jets 9 16 Capacity l min 2 5 bar Pressure Min Max Pressure Min Max Supply 1 1 2 Drain Conn HYDRAULIC CHARACTERISTICS ELECTRICAL CHARACTERISTICS 1 Multifunctions Sauna 18 1 Before connecti...

Страница 2: ...ON THE LEFT 1 2 POSITIONING THE SHOWER BASE Place the bathtub in the corner of the bathroom and make sure it is on a level by using the appropriate adjustable feet Prepare the drain connection using t...

Страница 3: ...back shower panel and into the shower base without tightening them 3 3a ASSEMBLING THE BACK PANELS Place drain cover on the drain in the shower base Move the shower base away from the corner in order...

Страница 4: ...1 so that they match up with the holes on the back panel B if necessary use a 2 5 Allen wrench Check that the seal fits properly along the entire length of the side panel B1 support Fasten the side pa...

Страница 5: ...between the back panel and the bathtub 5 6 INSTALLING THE TOP TRACK Remove the screws from the ends of the top track Insert the track onto the ends of the supports and fasten it to the back panels usi...

Страница 6: ...he lower track Lift the door up so that the top wheels N slide into the track MOUNTING THE TWO CLIMATE SAUNA DOME UNTO THE SHOWER CABIN Place the adhesive steam seal onto the top edge of the back pane...

Страница 7: ...with 2 Climates Steam Sauna Once the plugs D have been removed they should not be used again C Hot water connection Use a 90 cm flexible stainless steel hose F Cold water connection Use a 90 cm flexi...

Страница 8: ...H SEAT 3 4 2 1 7 8 6 5 4 2 3 10 EQUIPOTENTIAL EARTHING CONNECTION Connect the metal parts of the ca bin with the yellow wire as indica ted in the diagram There is a terminal at point 7 for the equipot...

Страница 9: ...2 USING THE SHOWER FOR THE FIRST TIME Once all of the connections are made and before fastening the ca bin to the wall remove all of the adhesive tags Run the regeneration and a sauna cycle following...

Страница 10: ...the frame drill a hole in the wall insert the screw with the fischer and fasten the bracket T1 to the frame tightening the screw with the washer C1 Remove the spacer and center the dome on the shower...

Отзывы: