23
RSTi-EP CPE200 Series Controllers Quick Start Guide
GFK-3109B
LED Behavior During Startup
After connecting to the power supply, apply power to the
EPXCPE. The controllers will require several seconds to power up.
Power-up LED Sequence:
1.
The CPU’s
REM IO LED
will blink
GREEN
when
the power is applied before turning it off.
2.
The RUN LED will turn solid
GREEN
before turning it off.
3.
The OK LED will turn solid
GREEN and remain on
.
Figure 8: LED Illumination Sequence
Содержание RSTi-EP CPE200 Series
Страница 2: ...RSTi EP CPE200 Series Controllers Quick Start Guide GFK 3109B Dec 2022 ...
Страница 15: ...12 RSTi EP CPE200 Series Controllers Quick Start Guide GFK 3109B Figure 3 Power Feed Minimum Current Draw ...
Страница 16: ...13 RSTi EP CPE200 Series Controllers Quick Start Guide GFK 3109B Figure 4 Power Feed Maximum Current Draw ...
Страница 28: ...25 RSTi EP CPE200 Series Controllers Quick Start Guide GFK 3109B Figure 6 Single LAN Mode ...
Страница 29: ...26 RSTi EP CPE200 Series Controllers Quick Start Guide GFK 3109B Figure 7 Dual LAN Mode ...