DISCONTINUED
PRODUCT
Installation Considerations
4
10. A breaker coordination study should be performed to ensure proper handling of fault currents.
NOTE
The instantaneous trip setting of the breaker feeding the UPS bypass input should be high
enough to accommodate short-duration overloads. The bypass static switch inside the UPS can
draw up to 10 times the system’s rated current for up to three cycles.
Содержание Liebert Series 610
Страница 6: ...DISCONTINUED PRODUCT iv ...
Страница 42: ...DISCONTINUED PRODUCT Installation Drawings 36 Figure 17 Battery power pack system 88 797616 03 Rev 08 ...
Страница 43: ...DISCONTINUED PRODUCT Installation Drawings 37 Figure 18 Battery power pack Size A 88 797616 01 Rev 10 ...
Страница 70: ...DISCONTINUED PRODUCT Installation Drawings 64 ...
Страница 75: ...DISCONTINUED PRODUCT ...