38
User Manual 10H52188UM60 - Rev. 2 - 09/2012
Parallel UPS Installation And Commissioning
Liebert NXC
‘Bat -’ and ‘PE’ terminals of the corresponding UPS I/O terminal block in parallel system through each battery MCB, as shown
in Figure 4-4.
PE
UPS 1
UPS 2
UPS 1 MCB
UPS 2 MCB
+
-
PE
Positive battery
string
+
-
PE
Bat
+
Bat N Bat
-
Bat
+
Bat N Bat
-
PE
Negative battery string
Figure 4-4 Connection diagram of shared battery string in 1 + 1 parallel system
Refer to Figure 4-5 to configure the positive battery string and negative battery string
Figure 4-5 Internal connection diagram for positive battery string and negative battery string
2. Setting
Power on the system, set each single UPS to shared battery string configuration through the Service Software ‘Settings’ ->
‘Shared Battery’ from each UPS unit; set the Service Software ‘Settings’ -> ‘Battery Cells Number’ and ‘Single Group Batt Cap’
from each UPS unit, and each UPS unit setting must be the same.
Note
1. For the parallel system used the shared battery strings, make sure that the
Service Software
settings are correct. Refer to 4.4.2 for
details of the settings.
2. For the parallel system used the shared battery strings, the ‘Single Group Batt Cap’ on the
Service Software
setting of each UPS stands
for the total capacity of battery strings, and each UPS can calculate the battery capacity itself automatically.
3. Close the battery MCB of each UPS.
first Block
second Block
third Block
sixteen Block
Battery string
Bat+
Bat-
PE
Battery cabinet