2.5 External Electrical Connection of Power System
The power system is front cable access system, and all electrical connections are
done through the front panel of the system power distribution unit and the
monitoring module.
Note:
The system wiring should be done by trained technicians.
2.5.1 Connections of Power Distribution Cables
Power distribution cables include: System AC input cable, system battery input
cable, and system DC output cable. The cable terminals are located on the front
panel of the system power distribution unit, as shown in Fig 2-2.
B
1.Circuit breaker for AC input
cable control (63A)
2. Circuit breaker for battery
branch control (63A)
3. Circuit breaker for Load 1
control (10A)
4. Circuit breaker for Load 2
control (20A)
5. Circuit breaker for Load 3
control (20A)
6. Circuit breaker for Load 4
control (50A)
7. AC phase line terminal
8. AC zero line terminal
9. Protecting ground terminal
10. Battery branch 48V-
terminal
11. Load branch 48V- terminal
12. Battery branch 48V+
terminal
13. Load branch 48V+ terminal
Fig.2-2 Connection Terminals and Control Switches for Distribution Cables