Instruction Manual
D103272X012
LCP100 Local Control Panel
August 2017
6
Table 3. Wiring Configurations with DVC6200 SIS Digital Valve Controller
LCP100 Protection Method
LCP100 Power Source
Wiring Order from
Logic Solver
DVC6200 SIS Mode
(Current or Voltage)
Refer to figure
Ex e mb [ib] IIC
Ex tb IIIC
LOOP
DVC6200 SIS then LCP100
Point-to-Point
5
Multi-Drop
6
LCP100 then DVC6200 SIS
Point-to-Point
7
Multi-Drop
8
24 VDC
DVC6200 SIS then LCP100
Point-to-Point
9
Multi-Drop
10
Ex ic IIC
Ex tb IIIC
LOOP
DVC6200 SIS then LCP100
Point-to-Point
11
Multi-Drop
12
LCP100 then DVC6200 SIS
Point-to-Point
13
Multi-Drop
14
24 VDC
DVC6200 SIS then LCP100
Point-to-Point
15
Multi-Drop
16
Ex ia IIB
Ex tb IIIC
LOOP
DVC6200 SIS then LCP100
Point-to-Point
17
Multi-Drop
18
LCP100 then DVC6200 SIS
Point-to-Point
19
Multi-Drop
20
Note
For intrinsically safe applications, the LCP100 forms an intrinsically safe explosion protection system when used with intrinsically
safe associated apparatus (a barrier) or with any other intrinsically safe devices.
The following requirements must be met: Uo ≤ Ui , Io ≤ Ii, Po ≤ Pi , Co ≥ Ci + Cc, Lo ≥ Li + Lc.
When installing the cover, tighten the screws evenly in a criss‐cross pattern such as the one indicated in figure 3, to a
torque of 2.82 N•m (25 lbf•in), to help ensure the cover is properly installed.
Figure 3. Proper Cover Installation
NOTE: TIGHTEN THE SCREWS IN A CRISS‐CROSS PATTERN
TO HELP ENSURE PROPER COVER INSTALLATION.
1
2
3
4