Emerson FB2100 Flow Computer Instruction Manual
D301783X012
March 2019
Installation
41
Figure 2-32. Battery Pack Attached to Compartment
2.
Route the wires of the free portion of the battery cable so that they sit completely inside the
open area at the top of the battery compartment.
3.
Rotate the electronics assembly up against the battery compartment and tighten the captive
fastening screws with a torque value of 2 to 4 in-lbs (0.2 to 0.5 N m) to close the
compartment.
4.
Close the enclosure.
Содержание FB2100
Страница 62: ...Emerson FB2100 Flow Computer Instruction Manual D301783X012 March 2019 58 Installation ...
Страница 76: ...Emerson FB2100 Flow Computer Instruction Manual D301783X012 March 2019 72 I O Configuration and Wiring ...
Страница 114: ...Emerson FB2100 Flow Computer Instruction Manual D301783X012 March 2019 Index 111 ...
Страница 115: ...Emerson FB2100 Flow Computer Instruction Manual D301783X012 March 2019 106 ATEX Non Sparking Zone 2 Certifications ...