CC7.8.9/0519/E 

 

2/7

 

Pressure resistance test and leak test 

 

CAUTION 

The system must be properly evacuated before filling the cooling circuit with refrigerant. 
This  should  result  in  a  reduction  of  the  residual  moisture  content  to  approx.  50  ppm. 
Evacuation  should  be  carried  out  to  less  than  3 mbar  and,  if  necessary,  the  vacuum 
should be broken with dried nitrogen. 

 

Depending on the installation, pressure strength tests and leak tests must be carried out on different pressure 
layers. The shut-off of system sections may be necessary. 

Several shut-off devices are installed  in  the  CO

2

 refrigeration  unit. These are suction  and  pressure shut-off 

valves  of  the  compressor,  high-pressure  control  valves  at  the  gas  cooler  outlet,  flash-gas  bypass  valves 
between the  liquid receiver and suction line, shut-off valves at the  liquid receiver and shut-off valves in the 
liquid line at the outlet from the refrigeration unit. 

It is the responsibility of the user to decide which barriers are to be opened/closed in order to carry out the 
pressure  tests.  For  the  evacuation  process,  it  is  recommended  that  all  shut-off  devices  be  opened  and 
evacuated from both sides via the connections on the suction side and the connection on the liquid receiver. 
The  shut-off  valves  at  the  discharge  port,  on  the  suction  side  of  the  compressor,  at  the  outlet  of  the  liquid 
receiver and the shut-off valve in the liquid line can traditionally be operated manually. 

To  open  the  high-pressure  control  valve  and  the  flash-gas  control  valve,  please  follow  the  instructions  in 
section 4 next page. 

 
 

Figure 2: Shut-off valves in the CO

2

 refrigeration unit 

 

 

 

Position 

Description 

Copeland Stream 
compressor 

Discharge mufler 

Gas cooler/condenser 

Flash tank 

Filter-dryer 

Sight glass 

Ball valve 

OW5 oil watch 

Pressure relief valve 

HPV 

High pressure valve 

BPV 

Bypass valve 

HP 

High-pressure limiter 

INV

 

Compressor inverter 

B1

 

Suction pressure 

B2

 

Discharge pressure 

B3

 

Liquid receiver pressure 

B4

 

Suction gas temperature 
unit 

B5

 

Suction gas temperature 
compressor 

B6

 

Discharge line temperature 

B7

 

Gas cooler temperature 

B8

 

Oil temperature 

B9

 

Ambient temperature 

B10

 

Cabinet temperature 

Содержание Copeland EazyCool CO2

Страница 1: ...sure side piping has been finalized and the electrical supply has been connected by qualified personnel please follow the steps below in preparation for commissioning Safety Verification of necessary safety devices in the system Visual inspection of the refrigerant pipes and especially of all connections Visual inspection of the electrical wiring of the supply line Checking the refrigeration unit ...

Страница 2: ...to be opened closed in order to carry out the pressure tests For the evacuation process it is recommended that all shut off devices be opened and evacuated from both sides via the connections on the suction side and the connection on the liquid receiver The shut off valves at the discharge port on the suction side of the compressor at the outlet of the liquid receiver and the shut off valve in the...

Страница 3: ...his serves to avoid incorrect measurements resulting from the pressure gradient along the connecting lines to the pump IMPORTANT Care must be taken that all components solenoids expansion devices regulators shut off valves etc in the refrigeration cycle which separate a part of the installation when de energized are manually opened to guarantee successful evacuation in the whole piping system NOTE...

Страница 4: ...ity over the valves override function 2 The compressor is switched off safety timers are ignored 3 The fan is switched off while auxiliary outputs are not influenced safety timers are ignored 4 The alarms are disabled except for the communication alarms Stopping the evacuation function The evacuation mode will be deactivated when 1 One of the 3 pressures probes P1 P2 P3 SPF6 or 2 the DISB key is p...

Страница 5: ...ressors F1 and fans F3 must be switched on and the release for the frequency inverter SB1 must be activated Figure 7 Enabling compressors fans frequency inverter The refrigeration unit starts automatically First the gas cooler fans start up then the compressor switches on and starts controlling according to suction pressure The filling process via the suction side can be completed The system shoul...

Страница 6: ... OFF 8 Use the UP and DOWN keys to adjust GC78 to the desired value 9 Press SET to apply the setting 10 Press EXIT to leave the menu GC20 Medium pressure flashtank setpoint Setpoint for the pressure in the liquid receiver in normal control mode GC78 Bypass medium pressure vessel Pressure with compressor OFF Maximum pressure in the liquid receiver during standstill of the refrigeration unit When th...

Страница 7: ...on compressor setpoint SETC1 SPF1 The lowest pumpdown setpoint will always be applied The following diagram illustrates the controller logic Figure 8 Controller logic for the pumpdown function NOTE The pumpdown setpoint will never be lower than what parameter RC02 allows 18 C 0 C Controller will perform pumpdown down to 18 C Ambient condition TAmb 20 C SPF5 20K Compressor setpoint SETC1 10 C SPF1 ...

Отзывы: