6
ETL Model No.: CF717-1
3. Installing Hanger Ball/Downrod Assembly
(For Standard Mounting) (Continued)
It is critical that the clevis pin in the motor coupler is
properly installed and the setscrews securely tightened.
Failure to verify that the pin and setscrews are properly
installed could result in the fan falling.
WARNING
!
MOTOR
COUPLER
SETSCREWS (2)
DOWNROD
Figure 3
3.3
Securely tighten the two setscrews into the motor coupler
until they rest against the downrod.
Pull up on the downrod to make sure the setscrews are
firmly installed against the downrod (Figure 3).
NOTE: The setscrew must be properly installed as
described above, or fan wobble could result.
GROMMET
COUPLER COVER
MOTOR HOUSING
DOWNROD
Figure 4
3.4
Make sure the grommet is properly installed in the motor
coupler cover then slide the motor coupler cover on the
downrod until it rests on the motor housing. Be sure the
motor coupler cover is oriented correctly (Figure 4).
DOWNROD
CEILING
COVER
Figure 5
3.5
Pass the 80-inch long motor leads through the opening in
the ceiling cover.
Place the ceiling cover over the downrod. Be sure the
ceiling cover is oriented correctly (Figure 5).
BP7483-2 ASHLAND CF717.qxp_BP7483 12/15/15 9:55 AM Page 6