![Emerson Research X-STREAM Series Скачать руководство пользователя страница 66](http://html.mh-extra.com/html/emerson-research/x-stream-series/x-stream-series_instruction-manual-addendum_2400951066.webp)
Emerson Process Management GmbH & Co. OHG
2-24
X-STREAM XEFD
Instruction Manual
HASXEDE-IM-EX
07/2017
After all connections are established in the
specified manner, and verified,
•
fix the cables according to the installation
instruction given in the cable glands/ con
-
duits manufacturer documentation.
• All cable entries must be sealed by
means of either Ex d approved cable
glands, conduits or sealing plugs.
2.5 Installation – Electrical
•
Install the analyzer’s cover by means of
ALL 20 screws!
Tightening torque
:
25 Nm (221 in.lb)
EXPLOSION HAZARD WHEN OPEN
Do NOT operate the instrument with doors or covers open! This is permitted
only when no hazardous atmosphere is present! Depending on the local
regulation, this may require a competent hot work supervisor to issue a
hot work permit.
Use ALL 20 screws to fix the cover!
Violation may cause an explosion hazard!
ELECTRICAL SHOCK HAZARD
Before completing the electrical connection of the instrument, verify that
the cables are inserted and connected in a correct manner!
Ensure that the earthing conductor (protective earth; PE) is connected!
CRUSHING HAZARD
Beware of crushing hazard when closing the analyzer front door!
Keep out of the closing area between enclosure cover and base!