14
Assembling the bottom filter with a level probe.
The level probe must be assembled using the relative kit with the supplied foot valve.
The foot valve is made to be installed at the bottom of the product container without sediment priming issues.
Connect the BNC on the level probe on the level input on the right side of the instrument. Insert the level probe with
the assembled bottom filter at the bottom of the tank of the product to be dosed.
Additional connections (with reference to page 11)
Connect the dioxide pump delivery (3) to the multi-function valve suction (5)
Connect the multi-function valve delivery to the system to dose the chlorine dioxide by injection
Connect the filling solenoid valve input (9) to a water source*
Connect the filter Discharge output (8) and the bleed of the reserve tank (10) to a drain
Connect the dosing pump suction (2 and 4) to the chemicals
*max 2bar with pressure stabiliser
Danger
1
1
2
2
3
3
4
4
5
5
6
6
A
A
B
B
C
C
D
D
Progettato da: Controllato da: Data:
Edizione Foglio
/
LASP4/V 4X6 40CM LANCIA
LASP4V04031Z03,5000
Massimo_F
Massimo_F
23/10/2014
00
Toll. Gen.
±0.05
Peso Lordo:
Peso Netto:
Materiale:
1 1
40
0.
00
50
9.
00
Содержание LOTUS AIR 10
Страница 40: ...40 Logical working scheme...
Страница 42: ...42...