7
Optional PTO Pump Kit
(PTO70)
PTO pump kit consists of PTO pump, reservoir assembly complete with
filter, suction hose, and required fittings.
1. Install reservoir on backhoe frame. Reservoir slides on top of exist-
ing frame. Holes may drilled in upper lip and bolted to ensure sta-
bility.
2. Route and connect suction hose from reservoir (A– DIAGRAM 3)
to pump through hole with other hoses in main backhoe frame.
[
DIAGRAM 2
]
3. Connect inlet hose at valve to pressure port on pump. Connect
return line from valve to fitting on bottom of reservoir on filter
head. [
B– DIAGRAM 3]
4. Install oil as required. Approximate system capacity is 5 gallons.
Dual purpose hydraulic/ transmission oil is recommended.
5. Attach pump to tractor PTO. Fasten pump to tractor drawbar with
chain.
DIAGRAM 2
DIAGRAM 1
DIAGRAM 3
Содержание Wallenstein GX600
Страница 12: ...12 ...
Страница 14: ...14 Locations of Grease Fittings Grease machine daily to ensure longevity of your backhoe ...
Страница 16: ...16 ...