INSTALLATION
Hanging Your Screen
The screen is now ready to be mounted onto the wall. The upper frame of
the screen needs to be lowered onto the Hanging Bracket, as shown below.
21
Please make sure the screen’s top frame is properly anchored in
the Mounting Bracket before letting go of the screen.
The screen needs to be stood
up vertically on the floor. Two
people are necessary to carry
and lift the screen up onto the
brackets.
8.
Now you are ready to enjoy the superb performance of Elara NanoEdge.
22
INSTALLATION
Hanging Brackets
To mount the screen to the wall, the location of the 4 edges need to be
determined. For screen specs, please refer to General Dimensions (page 4).
7.
Draw a center line for your screen in the desired location. Mount the
Hanging Bracket centered to your screen and 4 1/2” (116 mm) from the
top of the screen.
Please make sure the wall you are mounting your screen to is able
to support the weight of the screen. We recommend using your
own hardware for the installation. If using the hardware supplied,
(Wall Screws and Expansion Plug) ensure that it is compatible
with the wall.
You are now ready to mount your screen. Please make sure your screen is
fully assembled before proceeding.
The Hanging Bracket is designed to bear
the weight of the entire screen. Make sure
the bracket is sturdy before mounting the
screen.
Front
View
Side
View
Содержание Elara NanoEdge
Страница 1: ...User Guide Elara NanoEdge Fixed Frame Screen ...
Страница 15: ......