9
ASSEMBLY
Repeat step 2b using the other vertical frame.
2c)
After you have joined the two horizontal frames and all four corners, your
frame will look similar to below. Check and tighten all Set Screws as you
will not be able to access them once the Outer Frame is installed.
2d)
Make sure the corners are 90 degrees and the horizontal frames
are straight before proceeding.
Do not proceed until all the screws are tightened. There should
be no gap on the horizontal frames and less than 1mm gap on the
four corners.
10
ASSEMBLY
(Optional) On select large sized screens only, you will be provided with a
middle Support Bar. Insert both ends of the support bar into the middle of
the horizontal frames until snug.
2e)
If it is difficult to put the Support Bar into the middle of the
frame, try loosening the Set Screws on the four corners, inserting
and securing the middle support bar, then start from 2b.
Содержание Elara NanoEdge
Страница 1: ...User Guide Elara NanoEdge Fixed Frame Screen ...
Страница 15: ......