Operating the machine
7
1.2 Mechanical connection to the analyzer
Fig. 4: Autoloader reinstallation (Top view)
•
Before starting reinstallation take a look at the plastic tubes and bear in mind
the way they are supported with the screw (7). Make sure to lay them the
same way during reinstallation.
•
Place the loader to the right of the analyzer. The part (1) is the vertical bar
(profile) of the front right corner of the analyzer’s cabinet (top view of cross
section). For further orientation: The round part (2) is the left front foot of the
loader.
•
The loader is positioned in a way that the vertical rod (3) is pushed towards
the cabinet so that the cabinet’s corner rod (1) is inside the vertical rod (3).
•
The blade (4) is inserted between the rod (3) and the cabinet rod (1).
•
The angle rod (5) is installed and fixed with the screws (6).
•
Then the screws (7) are fixed so that a solid, stable mechanical connection
between analyzer and loader is made.
1
2
3
5
4
6
7
F r o n t p a n e l
B
Содержание CS-800
Страница 2: ...2 Copyright Copyright by Eltra GmbH Haan Retsch Allee 1 5 D 42781 Haan Federal Republic of Germany ...
Страница 3: ...3 ...
Страница 13: ...Operating the machine 13 Fig 13 Electrical circuit 14621 6001 3 4 1 5 6 2 ...
Страница 25: ......
Страница 26: ......
Страница 27: ......
Страница 28: ...Copyright Copyright by Eltra GmbH Haan Retsch Allee 1 5 D 42781 Haan Federal Republic of Germany ...