background image

Elterm M.M.Kaszuba Sp.J., ul. Przemysłowa 5, 86-200 Chełmno             

www.elterm.pl

 

 

 

4. With DHW set. LED display shows number 50 – it represents current HUW temperature set on 
boiler  (bottom  line  visible  on  display). 

  Increase  required  temperature, 

  decrease  required 

temperature,   confirm required temperature, 

 go to CH temperature setting. 

5. LED display shows number 20 – it represents current CH temperature set on boiler (upper line 
visible  on  display). 

 

Press  once  –  temperature  read  starts  to  pulse,

 

  increase  required 

temperature, 

  decrease  required  temperature, 

  confirm  required  temperature, 

  go  to  P01 

function. 

P01 – Boiler power – manual distribution 

 

Shows current boiler power setting, 

 increase power (67%, 100%), 

 decrease power (67%, 

33%),   confirm setting (100% is recommended), 

 go to P02 function.

 

P02 – Pump operation time setting 

 

Shows current pump operating time, 

 increase operating time, 

 decrease operating time, 

  confirm  setting  (10  is  recommended),  ON  parameter  on  display  sets  continuous  pump 

operation independently of boiler heaters operation status, 

 go to P03 function.

 

P03 – PID controller 

 

Shows current PID setting, 

 increase coefficient 

 decrease coefficient,   confirm setting (3 

is  recommended), 

  go  to  P04  function. 

Note:  if  it  takes  too  long  for  boiler  to  reach  required 

temperature, set coefficient on 4 or 5 and to 1 or 2 if the increase is too fast. 

 

P04 – Maximum boiler operating temperature - CH 

 

Shows  set  operating  temperature, 

  increase  temperature  up  to  70°C  (95°C  for  AsHZ  and 

ASBIII  only), 

  decrease  temperature, 

  confirm  setting  (70  is  recommended), 

  go  to  P05 

function.  

P05  –  Maximum  boiler  operating  temperature  –  DHW  (with  DHW  set  only) 

 

Shows  set 

operating temperature, 

 increase temperature up to 65°C, 

 decrease temperature down to 5°C, 

 confirm setting (50 is recommended), 

 go to P06 function. 

 

 

 

Содержание Battalion AsB III

Страница 1: ...ting and assembly manual electric tankless water heater for central heating systems Electric heating boiler Basic series Uhlan AsPC S Corporal AsP Sergeant AsBN Major AsZN Ensign AsC Mobil AsMB Indust...

Страница 2: ...Elterm M M Kaszuba Sp J ul Przemys owa 5 86 200 Che mno www elterm pl Elterm boilers technical data Uhlan AsPC S Corporal AsP Sergeant AsBN Major AsZN Ensign AsC Hussar AsHZ Battalion AsB III Mobil As...

Страница 3: ...Przemys owa 5 86 200 Che mno www elterm pl Colonel Sergeant Major Hussar power 4 12kW Colonel Sergeant Major Hussar power 15 24kW Uhlan power 4 12kW Ensign power 4 12kW CH 12 21kW DHW Battalion power...

Страница 4: ...kW 36 kW 39 kW 42 kW 45 kW 48 kW 66 kW 96 kW 144 kW 3 phases 3 phases 3 phases 3 phases 3 phases 3 phases 3 phases 3 phases 3 phases 3 phases 3 phases Safety fuses A 3 x 50 3 x 50 3 x 50 3 x 63 3 x 80...

Страница 5: ...xpansion vessel and circulation pump is included DHW set option for AsP AsBN AsZN AsHZ and AsB III includes electrovalve DHW priority wired sensor for tank and activation code Additional tank with coi...

Страница 6: ...an also be prepared in 1 phase version upon request Boiler s power supply is connected to terminal strip labeled as L1L2L3N PE wire needs to be connected to screw on mounting plate Boiler should be co...

Страница 7: ...diode is on heating is off and boiler in stand by mode recommended mode in off heating season 2 Press and hold power button for 5 seconds green diode appears 3 LED display shows number 300 and starts...

Страница 8: ...eration time setting Shows current pump operating time increase operating time decrease operating time confirm setting 10 is recommended ON parameter on display sets continuous pump operation independ...

Страница 9: ...second updates go to P08 function P08 Resettable energy consumption kWh meter useful for PV energy Display shows 0 kWh increase operation limit by 10kWh confirm setting After using set kWh countdown...

Страница 10: ...model Make sure the boiler is connected to electrical system in accordance with ELECTRICAL ASSEMBLY section 1 Red diode is on heating is off and boiler in stand by mode recommended mode in off heating...

Страница 11: ...boiler to reach required temperature set coefficient on 4 or 5 and to 1 or 2 if the increase is too fast Do not remove boiler external metal casing once device remains turned on In case boiler is acti...

Страница 12: ...ction between boiler and room thermostat Room temperature reached already idle time Wait for room temperature drop verification 5 LED display shows one of the below message E01 sensor error short circ...

Страница 13: ...ules for setting requirements concerning Ecodesign for energy related products Attachment 13 EU Commission regulation nr 622 2012 With regard to Ecodesign requirements for glandless standalone circula...

Страница 14: ...tee is invalid 5 If the serviceperson discovers machine failure resulting from the user s fault e g improperly made wiring system air locked central heating system use or assembly that is not in compl...

Страница 15: ...15 Elterm M M Kaszuba Sp J ul Przemys owa 5 86 200 Che mno www elterm pl Elterm leading Polish manufacturer of comprehensive heating solutions...

Страница 16: ...16 Elterm M M Kaszuba Sp J ul Przemys owa 5 86 200 Che mno www elterm pl...

Отзывы: