10
Elterm M.M.Kaszuba Sp.J., ul. Przemysłowa 5, 86-200 Chełmno
www.elterm.pl
P10 – Hygienisation (for DHW set only)
HIG sign shows,
↑
start process,
↓
stop process.
Note: hygienisation function increases HUW
temperature to 70°C level for one hour. Function operation is signalized by lower line blinking.
P11 – Max power (kW).
Display shows currently set power,
↑
increase,
↓
decrease, confirm setting
SETTINGS for AsPC-S model
Make sure the boiler is connected to electrical system in accordance with ELECTRICAL
ASSEMBLY section.
1.
Red diode is on, heating is off and boiler in stand-by mode – recommended mode in off-heating
season
2. Press and hold power button for 5 seconds, green diode appears
3. LED display shows number 29. with flashing dot and starts the countdown. This process cannot
be skipped – during this time only central heating pump is activated, heaters remain idle. 300
seconds should be sufficient for bleeding boiler and installation, if it isn’t - please turn the boiler
off and on again to repeat activity.