7
Elterm M.M.Kaszuba Sp.J., ul. Przemysłowa 5, 86-200 Chełmno
www.elterm.pl
LED display, signaling system and control
SETTINGS (see page 10 for AsPC-S model)
Boilers AsP, AsBN, AsZN, AsHZ and AsMB have been programmed with
power modulation possibility: 15kW unit power can be reduced to either
4/6/9kW, 18kW unit to 4/6/12kW, and 24kW unit to 12kW. This choice can be
made both on initial stage of installation or later one using appropriate
parameter (P11 - Max power (kW)).
Make sure the boiler is connected to electrical system in accordance with ELECTRICAL
ASSEMBLY section.
1.
Red diode is on, heating is off and boiler in stand-by mode – recommended mode in off-heating
season
2. Press and hold power button for 5 seconds, green diode appears
3. LED display shows number 300 and starts the countdown. This process cannot be skipped –
during this time only central heating pump is activated, heaters remain idle. 300 seconds should
be sufficient for bleeding boiler and installation, if it isn’t - please turn the boiler off and on again
to repeat activity.
1. LED display
2. CH operation diode (AsC, DHW set)
3. HUW operation diode (AsC, DHW set)
4. OK/ON/OFF button
5. LEFT – change button (
←
)
6. DOWN – decrease value (
↓
)
8. Diode – °C
9. Diode – power distribution
10. Diode – operating time
11. UP – increase value (
↑
)
12. ON green diode
13. RIGHT – change button (
→
)
14. OFF red diode
AsPC-S panel
panel