background image

14 

Elterm M.M.Kaszuba Sp.J., ul. Przemysłowa 5, 86-200 Chełmno             

www.elterm.pl

 

 

 

GUARANTEE 

Boiler model: 
 

Serial number: 
 

Production date: 

 
Sales date:

 

Legible stamp and signature of sales point 

 

Stamp of installing company 

(hydraulics) 

Stamp of installing company 

(electricity) 

I declare I have familiarized 

myself with guarantee terms. 

 

 

 

Without above stamps and signatures, guarantee is not valid. 

 

1.

 

Guarantee for trouble-free operation is valid for a period of 24 months (12 months for AsMB). 

2.

 

Guarantee expires if any alterations are made to the product without the manufacturer’s consent, or if assembly 

or use are not in accordance with the enclosed operation manual and terms and conditions of guarantee. 

3.

 

Guarantee repairs are made by the manufacturer or persons/companies authorized by the same.  

4.

 

If filled out incompletely, the guarantee is invalid. 

5.

 

If  the  serviceperson  discovers  machine  failure  resulting  from  the  user’s  fault  (e.g.  improperly  made  wiring 

system, air-locked central heating system, use or assembly that is not in compliance with the user manual etc.), 

or in the event the guarantee is invalid, the costs of repair and travelling are borne by the claimant.  

6.

 

Failure on the part of the user to follow the serviceperson’s recommendations provided in the guarantee repair 

protocol results in the guarantee being suspended until such recommendations are implemented. 

Stamp of serviceman, short description of repair and recommendations for the user

 

 

 

Following guarantee repair by the serviceman, one of the below guarantee coupons to be cut off, filled out and handed to the 

serviceman. 

Guarantee coupon I 

 

…………………………….…………………………………………………………………………………………………………………………… 

Full name and address of the boiler owner  

 
 

…………………………….…………………………………………………………………………………………………………………………… 

Postal code, town /Boiler owner tel. no 

 
 

…………………………….…………………………………………              ………………………………………………………… 

Production date                Boiler serial no.

 

Guarantee coupon II 

 

…………………………….…………………………………………………………………………………………………………… 

Full name and address of the boiler owner  

 
 

…………………………….…………………………………………………………………………………………………………………………… 

Postal code, town /Boiler owner tel. no  

 
 

…………………………….…………………………………………              ………………………………………………………… 

Production date                Boiler serial no.

 

Содержание Battalion AsB III

Страница 1: ...ting and assembly manual electric tankless water heater for central heating systems Electric heating boiler Basic series Uhlan AsPC S Corporal AsP Sergeant AsBN Major AsZN Ensign AsC Mobil AsMB Indust...

Страница 2: ...Elterm M M Kaszuba Sp J ul Przemys owa 5 86 200 Che mno www elterm pl Elterm boilers technical data Uhlan AsPC S Corporal AsP Sergeant AsBN Major AsZN Ensign AsC Hussar AsHZ Battalion AsB III Mobil As...

Страница 3: ...Przemys owa 5 86 200 Che mno www elterm pl Colonel Sergeant Major Hussar power 4 12kW Colonel Sergeant Major Hussar power 15 24kW Uhlan power 4 12kW Ensign power 4 12kW CH 12 21kW DHW Battalion power...

Страница 4: ...kW 36 kW 39 kW 42 kW 45 kW 48 kW 66 kW 96 kW 144 kW 3 phases 3 phases 3 phases 3 phases 3 phases 3 phases 3 phases 3 phases 3 phases 3 phases 3 phases Safety fuses A 3 x 50 3 x 50 3 x 50 3 x 63 3 x 80...

Страница 5: ...xpansion vessel and circulation pump is included DHW set option for AsP AsBN AsZN AsHZ and AsB III includes electrovalve DHW priority wired sensor for tank and activation code Additional tank with coi...

Страница 6: ...an also be prepared in 1 phase version upon request Boiler s power supply is connected to terminal strip labeled as L1L2L3N PE wire needs to be connected to screw on mounting plate Boiler should be co...

Страница 7: ...diode is on heating is off and boiler in stand by mode recommended mode in off heating season 2 Press and hold power button for 5 seconds green diode appears 3 LED display shows number 300 and starts...

Страница 8: ...eration time setting Shows current pump operating time increase operating time decrease operating time confirm setting 10 is recommended ON parameter on display sets continuous pump operation independ...

Страница 9: ...second updates go to P08 function P08 Resettable energy consumption kWh meter useful for PV energy Display shows 0 kWh increase operation limit by 10kWh confirm setting After using set kWh countdown...

Страница 10: ...model Make sure the boiler is connected to electrical system in accordance with ELECTRICAL ASSEMBLY section 1 Red diode is on heating is off and boiler in stand by mode recommended mode in off heating...

Страница 11: ...boiler to reach required temperature set coefficient on 4 or 5 and to 1 or 2 if the increase is too fast Do not remove boiler external metal casing once device remains turned on In case boiler is acti...

Страница 12: ...ction between boiler and room thermostat Room temperature reached already idle time Wait for room temperature drop verification 5 LED display shows one of the below message E01 sensor error short circ...

Страница 13: ...ules for setting requirements concerning Ecodesign for energy related products Attachment 13 EU Commission regulation nr 622 2012 With regard to Ecodesign requirements for glandless standalone circula...

Страница 14: ...tee is invalid 5 If the serviceperson discovers machine failure resulting from the user s fault e g improperly made wiring system air locked central heating system use or assembly that is not in compl...

Страница 15: ...15 Elterm M M Kaszuba Sp J ul Przemys owa 5 86 200 Che mno www elterm pl Elterm leading Polish manufacturer of comprehensive heating solutions...

Страница 16: ...16 Elterm M M Kaszuba Sp J ul Przemys owa 5 86 200 Che mno www elterm pl...

Отзывы: