112
7.
Place thread between upper thread guide forks.
8.
Insert thread into groove and follow pathway as
illustrated,
1
-
5
. Pull approximately 4 cm (1
1/2") of thread to the right. Pull the thread
towards you and thread will be cut by blade
A
.
9.
Remove bobbin winder guide.
10. Close bobbin winder cover.
NOTE: Before attempting to rethread, see
page 154 on how to remove thread
remnants.
7
A
8
9
!0
1
2
3
4
5
Содержание XQUISIT 2
Страница 18: ...17...
Страница 86: ...85 Tripled Designs T NOTE Use T foot Alphabets Numbers A 7 mm Block NOTE Use I foot unless using key...
Страница 87: ...86 7 mm Script NOTE Use T foot 15 and 25 mm Script NOTE Use T foot Outline NOTE Use T foot...
Страница 88: ...87 Utility U NOTE Use I foot Heirloom H NOTE Use I foot Quilt Q NOTE Use I foot...
Страница 107: ...106 Century Bold Script Euro...
Страница 108: ...107 Designs Continuous Hoop...
Страница 163: ...162...