Network Motion Controller Installation Guide
MAN-G-LION 100 PrelIG (Ver. 1.004)
|Connector Pinouts|
www.elmomc.com
20
20
Table of Contents
Chapter 7:
Mounting the Gold Lion 100
The Gold Lion 100 has three mounting options:
•
Wall mount
•
Surface mount
7.1.1
Wall Mount
Two M4 round head screws, one through each opening in the heat sink, are used to mount the Gold
Maestro (see the diagram below) on a wall.
Figure 1: Wall Mounting the Gold Lion 100
7.1.2
Surface Mount
Use four M4 round head screws, one through each opening in the heat sink to connect the Gold
Maestro to a surface.
Figure 2: Surface Mounting the Gold Lion 100