Gold Bell Installation Guide
MAN-G-BELIG (Ver. 1.200)
|Unpacking the Drive Components|
www.elmomc.com
13
Table of Contents
Chapter 5:
Installation
The Gold Bell must be installed in a suitable environment and properly connected to its voltage
supplies and the motor.
5.1
Unpacking the Drive Components
Before you begin working with the Gold Bell, verify that you have all of its components, as follows:
•
The Gold Bell servo drive
•
The Elmo Application Studio (EAS) software and software manual
The Gold Bell is shipped in a cardboard box with Styrofoam protection.
To unpack the Gold Bell:
1.
Carefully remove the servo drive from the box and the Styrofoam.
2.
Check the drive to ensure that there is no visible damage to the instrument. If any damage
has occurred, report it immediately to the carrier that delivered your drive.
3.
To ensure that the Gold Bell you have unpacked is the appropriate type for your
requirements, locate the part number sticker on the side of the Gold Bell. It looks like this:
4.
Verify that the Gold Bell type is the one that you ordered, and ensure that the voltage meets
your specific requirements.
The part number at the top provides the type designation. Refer to the appropriate part
number in the section Catalog Number at the beginning of the installation guide.