background image

 

 

\\Elmacron-server\Gemensam\Instruktioner\Instruktioner i W ord\1005RE\Engelska\1005RE-ORP%E.doc 

- 4 -

 

Senast utskrivet 2007-10-11 
11:16

 

 

2.3.2 Connection of the power supply 

Connect the power supply to terminal 1 (earth), terminal 2 (zero) and terminal 3 (live). 

2.3.3 Connection of dosing pumps and valves ( control outputs ) 

Connection to relay output 1 (X1) is made through terminal 4 and terminal 6, connection to relay 
output 2 (X2) is made through terminal 7 and terminal 9, connection to relay output 3 (L1) is made 
through terminal 10 and terminal 12 and connection to relay output 4 (L2) is made through terminal 13 
and terminal 15. 

2.3.4 Connection to an external alarm 

Connect alarm to terminal 16 and terminal 18. 

2.3.5 Connection of the electrode 

Electrode cabling is a very critical part for the safety and accuracy in measuring. 

 

Use a low noise coax cable between the electrode and the input terminal on the controller. 

 

Low noise cables has, in general, a black semi-conductive sheath between the centrewire 
insulation and the shield. Remove this sheath. 

 

Keep the cable away from power wires. 

 

Max recommended length of cable is 10 meters. 

 

Connect the centre ( metal pin ) of the coax cable to terminal 19 ( ELCT + ). 

 

Connect the shield ( reference ) of the coax cable to terminal 20 ( ELCT - ). 

 
 

NOTE! When using PtPK/G (Cr-instrument) do as follow: 

 

connect the shield ( reference ) of the coax cable to terminal 19 ( EL+ )  

 

connect the centre ( metal pin ) of the coax cable to terminal 20 ( EL- )

 

2.3.6 Connection of a recorder 

Connect the recorder to terminal 25 ( REC + ) and terminal 26 ( REC - ). 

2.4 CHECK THE CONNECTIONS  

Before the power supply is turned on; check that the connections are mechanical and electrical 
correct. 
 

E1 E1 N1 N1 L1 L1

REL1AB

REL2AB REL3AB REL4AB

REL5AB

1

1

2

2

3

3

4

6

8

10

12

14

16

18

5

7

9

11

13

15

17

19 20

21 22 23 24

25 26

E1 E1 N1 N1 L1 L1

1

1

2

2

3

3

(X1)

(X2)

(L1)

(L2)

(LARM)

Содержание 1005RE

Страница 1: ...1005RE ORP v1 1b Instructions...

Страница 2: ...N AT ON OFF AND PWM REGULATION 5 2 6 EXAMPLE OF INSTALLATION AT FREQUENCY REGULATION 5 3 FUNCTIONS 6 3 1 COMMON FUNCTIONS 6 3 2 6 3 2 1 MEASURE 6 3 2 2 CAL 1 6 3 2 3 EXIT TO MEASURE 6 3 2 4 L1 6 3 2 5...

Страница 3: ...n isolated output 0 4 20 mA proportional to the measured value for connection to for example a computer printer or other recording equipment When measuring is interrupted the output stays frozen at th...

Страница 4: ...CONNECTIONS 2 3 1 Preparation Loosen the 4 plastic screws that hold the instrument front part at the same time as the front is kept on place with one hand Loosen carefully the front part and fasten t...

Страница 5: ...ng Use a low noise coax cable between the electrode and the input terminal on the controller Low noise cables has in general a black semi conductive sheath between the centrewire insulation and the sh...

Страница 6: ...ccording to the drawing to the left 2 6 EXAMPLE OF INSTALLATION AT FREQUENCY REGULATION Example connection of electromagnetic dosing pumps designed for 230 volts supply and pulse input E1 E1N1N1 L1 L1...

Страница 7: ...ys frozen at the latest value the relays opens up and the regulation is paused until is pressed 3 2 3 2 1 MEASURE When power supply is connected the measuring mode starts 3 2 2 CAL 1 Offset calibratio...

Страница 8: ...100 3 2 11 I TIME Integration time between 0 2000 seconds 3 2 12 ALARM The alarm relay delay can be set to 0 9999 seconds When an error occurs in the measuring mode the alarm diode activates at the s...

Страница 9: ...1 at parameter setting mode FUNCTION 2 in measuring mode Steps down the menu Accelerating key Increase the value in setting mode Used when making a choice according to the display Interrupt measuring...

Страница 10: ...er of pulses minute is decided by the distance between the limit value and the actual value the chosen proportional band and the chosen max frequency Example at frequency regulation Limit value 1 25 h...

Страница 11: ...h modulated regulation Parameters Limit value 1 20 high Xp band 25 Period time T 100 seconds The proportional band the XP band is given in of full measure range Measure range 0 100 100 units which giv...

Страница 12: ...on compared with P regulation The doubling is performed with an interval corresponding to the set I time until either the measured value is within the limits or that max frequency alt max on time is r...

Страница 13: ...as to be set Turn the power supply on 5 2 1 Relay configuration When delivered the instrument is pre set for On Off regulation Limit value 1 is set to 100 min value LO limit value 2 is set to 100 min...

Страница 14: ...irm 3 Decide the function shutdown at alarm shall be on Shon or off ShoF with Press to confirm 3 Step to EXIT TO MEASURE by pressing M repeatedly Press to start measuring 5 2 2c Proportional regulatio...

Страница 15: ...ired set 0000 Use and Press to confirm 9 The diode at ALARM is activated the display shows 0300 Set the time delay in seconds use and Press to confirm 11 Decide if the function shutdown at alarm shall...

Страница 16: ...the EXIT TO MEASURE diode is activated The display shows the actual measured value in the solution measured at the same time as the corresponding mA signal is sent to the output During the operation...

Страница 17: ...sponding signal is sent to the output Press 04 00 is shown on display at the same time as the corresponding signal is sent to the output Press CH04 Test of the diodes All the menu diodes are activated...

Страница 18: ...to measuring mode the measuring starts automatically 6 3 RESET OF DEFAULT SETTINGS The default settings are reset according to chapter 5 1 1 Turn the power supply off 2 Press and turn on the power su...

Страница 19: ...ply 230 VAC 50 Hz Backup 10 years Range 0 100 Accuracy 0 1 Resolution 0 1 Offset Range 30 Calibration Offset 5 Input ORP inp z 10 12 Outputs Output 0 20 mA 4 20 mA Max load output 700 Alarm relay Pote...

Отзывы: