Handling during operation
18
BA/Elmasteam/GB/0306
© Elma GmbH & Co KG
Caution! The water tap and the ball valve on the pump must
remain opened during operation. Risk of damage to the
pump. Ensure that the water supply to the pump is stopped
as soon as the unit is left unattended for any length of time.
Water connections
must remain opened
during operation
When the Elmasteam is switched on, the pump automatically fills
the tank with the optimum quantity of water. As soon as the water
level in the tank goes below a certain filling level, the pump
automatically refills the tank up to the correct level. The filling
process is indicated by the yellow lamp “running” (
illustration 7.2
D).
When the maximum filling level of the tank is reached, the
green indicator lamp “maximum” is turned on (
illustration 7.2 E).
Pump guarantees
optimum filling level
D
E
A
B
C
Illustration 4.8 Pump back view
Illustration 4.9 Pump front view
5
Handling during operation
For reasons of safety, the steam cleaner must be operated by
authorized and correctly instructed personnel only.
Authorized personnel
Risk of scalding by hot steam!
•
Unauthorized third persons must not keep within reach of
the steam jet during operation of the unit.
•
Ensure your own safety! Be careful when the steam outlet is
activated.
•
Avoid hazardous situations caused by unintended activation
of the steam outlet. Switch the unit into „stand-by“ mode
during operating breaks.
CAUTION
Put the unit into operation as described in section 4.
Preconditions
Make sure before start-up that the tank is filled. Otherweise fill
the tank as described in section 4.
Tank must be filled
Switch on the Elmasteam by turning the function switch
(
illustration 3.2 / 3.3 A
) to the “standby” position. The unit starts
to generate pressure (see manometer,
illustration 3.2 / 3.3 B
).
Switch the unit in
position ”standby”
As soon as the operating pressure (8 bar) is reached, the green
lamp “ready” indicates that the unit is ready for operation. As
soon as a nozzle is activated the indicator lamp goes out.
Green indicator lamp
“ready”